公开(公告)号:US20120183357A1
公开(公告)日:2012-07-19
申请号:US13498177
申请日:2010-09-24
IPC分类号: F16L1/12
摘要: Offshore deployment device for an installation vessel with a deck to deploy a hydrocarbon transfer pipe composed of several pipe segments, the device comprising a trolley hoist lifting means, installed in a tower to lift a pipe segment from an horizontal position into a vertical position, an assembly platform, where a segment is connected to a previously launched transfer pipe string, the assembly platform being provided with a clamping device that is supported on the installation vessel and adapted to support the weight of the previously launched pipe string during assembling, characterized in that the hydrocarbon transfer pipe is a flexible hose string composed of several flexible hose segments, the flexible hose string being guided from a vertical position into an inclined or a horizontal position via a hose string guide element which is placed under the assembly platform.
摘要翻译: 一种用于安装容器的海上展开装置,其具有甲板以部署由多个管段组成的烃输送管,该装置包括安装在塔架中以将管段从水平位置提升到竖直位置的吊车提升装置, 组件平台,其中一段连接到先前发射的传送管柱,该组装平台设置有夹紧装置,该夹紧装置被支撑在安装容器上并且适于在组装期间支撑先前发射的管柱的重量,其特征在于 烃输送管是由多个柔性软管段组成的柔性软管串,柔性软管串通过放置在组装平台下方的软管引导元件从垂直位置引导到倾斜或水平位置。
-
公开(公告)号:US07509919B2
公开(公告)日:2009-03-31
申请号:US11703278
申请日:2007-02-07
申请人: Eric Sebellin
发明人: Eric Sebellin
IPC分类号: B63B35/44
CPC分类号: B63B35/00 , B63B21/50 , B63B2003/147
摘要: An installation vessel has upper and lower decks (40, 50) that are vertically spaced about 3 meters apart, with most of the lower deck covered by the upper one, but with a rear portion (60) of the lower deck being uncovered. The upper deck is used primarily for storage, while the lower deck is the one used for installation of anchor chains, wires, ropes, etc. that pass from a winch (81) to a stern roller (84) at the rear of the lower deck, so dangerous conditions of chains, wires, ropes, etc. moving along a deck during installation are confined to the lower deck. A main crane (72) that lies on one side of the vessel, lies forward of the rear end of the upper deck at a location wherein the crane can reach all portions of the uncovered lower deck portion and most of the upper deck.
摘要翻译: 安装船具有相互间隔约3米的上下甲板(40,50),其中大部分下甲板被上部甲板覆盖,但下甲板的后部(60)未被覆盖。 上甲板主要用于存放,而下甲板是用于安装从绞盘(81)到下部后部的船尾辊(84)的锚链,钢丝绳,绳索等的安装。 甲板上,在安装期间沿着甲板移动的链条,电线,绳索等危险状况被限制在下甲板上。 位于容器一侧的主起重机(72)位于上甲板的后端的前方,其中起重机可以到达未覆盖的下甲板部分和上甲板的大部分的所有部分。
-
公开(公告)号:US20070193496A1
公开(公告)日:2007-08-23
申请号:US11703278
申请日:2007-02-07
申请人: Eric Sebellin
发明人: Eric Sebellin
IPC分类号: B63B9/06
CPC分类号: B63B35/00 , B63B21/50 , B63B2003/147
摘要: An installation vessel has upper and lower decks (40, 50) that are vertically spaced about 3 meters apart, with most of the lower deck covered by the upper one, but with a rear portion (60) of the lower deck being uncovered. The upper deck is used primarily for storage, while the lower deck is the one used for installation of anchor chains, wires, ropes, etc. that pass from a winch (81) to a stern roller (84) at the rear of the lower deck, so dangerous conditions of chains, wires, ropes, etc. moving along a deck during installation are confined to the lower deck. A main crane (72) that lies on one side of the vessel, lies forward of the rear end of the upper deck at a location wherein the crane can reach all portions of the uncovered lower deck portion and most of the upper deck.
摘要翻译: 安装船具有相互间隔约3米的上下甲板(40,50),其中大部分下甲板被上部甲板覆盖,但下甲板的后部(60)未被覆盖。 上甲板主要用于存放,而下甲板是用于安装从绞盘(81)到下部后部的船尾辊(84)的锚链,钢丝绳,绳索等的安装。 甲板上,在安装期间沿着甲板移动的链条,电线,绳索等危险状况被限制在下甲板上。 位于容器一侧的主起重机(72)位于上甲板的后端的前方,其中起重机可以到达未覆盖的下甲板部分和上甲板的大部分的所有部分。
-
公开(公告)号:US08894326B2
公开(公告)日:2014-11-25
申请号:US13498177
申请日:2010-09-24
摘要: Offshore deployment device for an installation vessel (4) with a deck (5) to deploy a hydrocarbon transfer pipe (2) composed of several pipe segments (3), the device including a trolley hoist lifting element (10), installed in a tower (6) to lift a pipe segment from an horizontal position into a vertical position, an assembly platform (8), where a segment is connected to a previously launched transfer pipe string, the assembly platform being provided with a clamping device that is supported on the installation vessel and adapted to support the weight of the previously launched pipe string during assembling, wherein the hydrocarbon transfer pipe is a flexible hose string composed of several flexible hose segments, the flexible hose string being guided from a vertical position into an inclined or a horizontal position via a hose string guide element (15) which is placed under the assembly platform.
摘要翻译: 一种具有甲板(5)的安装容器(4)的海上展开装置,用于部署由几个管段(3)组成的烃输送管(2),该装置包括安装在塔架中的手推车提升元件(10) (6)将管段从水平位置提升到垂直位置;组装平台(8),其中段连接到先前发射的传送管柱,所述组装平台设置有夹持装置,所述夹紧装置被支撑在 安装容器并且适于在组装期间支撑先前发射的管柱的重量,其中烃输送管是由几个柔性软管段组成的柔性软管串,柔性软管串从垂直位置引导到倾斜或 水平位置通过一个置于装配平台下方的软管绳引导元件(15)。
-
-
-