摘要:
A method for making dynamic borehole azimuth measurements while drilling includes processing cross-axial magnetic field measurements in combination with accelerometer measurements to compute the dynamic borehole azimuth. In one or more embodiments, the cross-axial magnetic field measurements and the accelerometer measurements may be used to compute the magnitude of a cross-axial magnetic field component, a toolface offset, and a borehole inclination, which may in turn be used to compute the dynamic borehole azimuth. The disclosed methods may utilize near-bit sensor measurements obtained while drilling, thereby enabling a near-bit dynamic borehole azimuth to be computed while drilling.
摘要:
A method for making dynamic borehole azimuth measurements while drilling includes processing cross-axial magnetic field measurements in combination with accelerometer measurements to compute the dynamic borehole azimuth. In one or more embodiments, the cross-axial magnetic field measurements and the accelerometer measurements may be used to compute the magnitude of a cross-axial magnetic field component, a toolface offset, and a borehole inclination, which may in turn be used to compute the dynamic borehole azimuth. The disclosed methods may utilize near-bit sensor measurements obtained while drilling, thereby enabling a near-bit dynamic borehole azimuth to be computed while drilling.
摘要:
A method for drilling a well, the method including: identifying another well proximate to the well being drilled; collecting spatial information for at least a portion of the another well and the well being drilled; estimating a trajectory for at least a portion of the well being drilled and the another well; estimating an uncertainty in spatial information for each trajectory; estimating a probability of a collision with the another well during the drilling of the well by integrating a probability density function using the uncertainties and the trajectories; and performing the drilling in a manner that limits the probability of collision. A system and another method are provided.
摘要:
The disclosure provides a method which includes transmitting signals over a time period between a downhole location and a surface location during drilling of a wellbore; recording the time of each signal at the surface using a surface clock and the time of each signal downhole using a downhole clock; and correcting the downhole measurements using the recorded times.
摘要:
A method is disclosed for determining wellbore azimuth accurately, notwithstanding the corrupting influence of axial and transverse magnetic field biasing error components.A reliable value of the axial magnetic field component (B.sub.x) is determined by minimizing the vector distance between B (as measured) and its expected value B. Preferably, this is accomplished utilizing a method of radicals to solve a quadratic equation.Given a reliable B.sub.x, the transverse magnetic field components (B.sub.x and B.sub.x) can be determined from taking a number of surveys as the drillstring is rotated about. B.sub.x and B.sub.x can be determined by utilizing the assumption that the transverse magnetic field components should remain invariant as the drillstring is rotated.
摘要翻译:公开了一种用于准确地确定井眼方位角的方法,尽管轴向和横向磁场偏置误差分量的腐蚀影响。 通过最小化B(测量)与其预期值+ E,uns B + EE之间的矢量距离来确定轴向磁场分量(Bx)的可靠值。 优选地,这是利用自由基的方法来求解二次方程。 给定可靠的Bx,横向磁场分量(Bx和Bx)可以通过在钻柱旋转约数时进行多次调查来确定。 Bx和Bx可以通过利用横向磁场分量在钻柱旋转时保持不变的假设来确定。
摘要:
A method for making dynamic gravity toolface measurements while rotating a downhole measurement tool in a borehole is disclosed. The method includes processing magnetic field measurements and accelerometer measurements to compute a toolface offset and further processing the toolface offset in combination with a magnetic toolface to obtain the dynamic gravity toolface. Methods for correcting dynamic and static navigational sensor measurements to remove sensor biases, for example, are also disclosed.
摘要:
The disclosure provides a method which includes transmitting signals over a time period between a downhole location and a surface location during drilling of a wellbore; recording the time of each signal at the surface using a surface clock and the time of each signal downhole using a downhole clock; and correcting the downhole measurements using the recorded times.
摘要:
A multi-station gravity and magnetic survey is carried out in a borehole. The data from the survey are processed to estimate the inclination and azimuth of the borehole. The drill collar relative permeability is estimated, and the estimated drill collar permeability is then used to remove the effects of induced magnetization of the drill collar on the magnetic measurements.
摘要:
A system for transmitting information in a well comprises a tubular string disposed in the well and having a drilling fluid flowing therethrough. A pulser is disposed in the tubular string and transmits a pulse synchronization marker comprising a chirp signal. A surface controller, acting under programmed instructions, detects the chirp signal adjusts a signal decoding technique based on the detected chirp signal.
摘要:
The present invention provides a method for determining magnetometer errors during wellbore survey operations. It is capable of determining errors on up to three axes, with or without the use of an external reference measurement of the local magnetic field, and is capable of providing an accurate result using data from a minimum number of surveys. A model is used to correct the observed data and the corrected data are transformed from the tool coordinate system to a different coordinate system referenced to the earth. The difference between the corrected transformed data and reference data in the earth coordinate system is minimized to determine the model parameters. The present invention also provides a method for determining residual uncertainty in the measurements and for quality control of the measurements. By making the observations over a period of time, any deterioration of the sensors may be identified.