公开(公告)号:US20130251460A1
公开(公告)日:2013-09-26
申请号:US13893950
申请日:2013-05-14
发明人: Alain DESMEULES
IPC分类号: E02D5/52
CPC分类号: E02D5/526 , E02D5/285 , E02D27/12 , Y10T403/55
摘要: A pile connecting metal bracket adapted to be secured to a structure to be supported by a metal pile is described. The bracket has a pair of elongated straight vertical support flanges in a pair of spaced-apart horizontal guide walls secured across the vertical support flanges. The guide wall guides driven hollow metal tubes of the pile. A drive mechanism is removably connected to an attachment. The pile connecting bracket is secured to a structure and the metal tubes of the pile are connected to the metal bracket after the metal pile has been driven into soil to a position of rest whereby the pile can support the structure
摘要翻译: 描述了一种适于固定到由金属桩支撑的结构的桩连接金属支架。 支架具有一对细长的直的垂直支撑凸缘,这些凸缘在一对间隔开的水平导向壁中,横向穿过垂直支撑凸缘。 引导壁引导着桩的中空金属管。 驱动机构可拆卸地连接到附件。 桩连接托架被固定在结构上,并且在金属桩已经被驱动到土壤中之后,桩的金属管被连接到金属支架上,使得桩可以支撑结构
-
公开(公告)号:US20110002744A1
公开(公告)日:2011-01-06
申请号:US12828439
申请日:2010-07-01
摘要: A pile splice section for a spliced prestressed concrete pile includes a prestressed concrete element including a first end and a second end and a plurality of tendons that extend from the first end to the second end. A first end assembly at the first end of the prestressed concrete element includes a first plate coupled to the plurality of tendons. The first end assembly further includes a plurality of internally threaded fasteners embedded in the first end of the prestressed concrete element that are engagable via apertures extending through the first plate. A second end assembly at the second end of the prestressed concrete element includes a second metal plate coupled to the plurality of tendons. The second end assembly further includes a plurality of apertures extending through the second plate and accessible via pockets proximate the second end of the prestressed concrete element.
摘要翻译: 用于拼接预应力混凝土桩的桩接头部分包括预应力混凝土构件,其包括第一端和第二端以及从第一端延伸到第二端的多个筋。 在预应力混凝土构件的第一端处的第一端组件包括联接到多个腱的第一板。 第一端组件还包括嵌入在预应力混凝土构件的第一端中的多个内螺纹紧固件,其通过延伸穿过第一板的孔可接合。 在预应力混凝土构件的第二端处的第二端组件包括联接到多个腱的第二金属板。 第二端组件还包括延伸穿过第二板的多个孔,并且可通过靠近预应力混凝土构件的第二端的凹部接近。
-
公开(公告)号:US20090263189A9
公开(公告)日:2009-10-22
申请号:US12100788
申请日:2008-04-10
申请人: Kari Koivunen
发明人: Kari Koivunen
IPC分类号: E02D5/30
CPC分类号: B28B23/0056 , B29C39/10 , E02D5/30 , E02D5/523 , E02D5/526 , E02D5/54 , E04C3/22 , E04C3/34 , Y10T29/49623 , Y10T403/7086
摘要: The invention relates to providing a concrete pile splice between driven reinforced concrete piles to join them together end-to-end, with the ends of both reinforced concrete piles to be joined having an end surface. The joint of each pile includes lock rods provided with pin-receiving holes, cylindrical lock sockets provided with pin-receiving through-holes to which pin-receiving tube-like parts are used to interconnect the lock sockets, and locking pins. A pair of joints forming a splice consists of two similar joint pieces. The joint is installed at the end of the concrete pile during the poured casting process. In order to reduce the cost of manufacture and materials of the splicing pieces and to achieve reliability in operation, they are made by machining or welding. Preferably, the hole (6) in the lock rod and the hole (19a) of the crosswise tunnel (9) extending through the lock socket have an eccentric disposition relative to each other.
摘要翻译: 本发明涉及在被驱动的钢筋混凝土桩之间提供混凝土桩接头,以将它们端对端地连接在一起,两个钢筋混凝土桩的端部具有端面。 每个桩的接头包括设置有销接收孔的锁定杆,设置有销接收通孔的圆柱形锁定插座,使用销接收管状部件来连接锁定插座和锁定销。 形成接头的一对接头由两个相似的连接件组成。 在铸造过程中,接头安装在混凝土桩的末端。 为了降低拼接件的制造成本和材料,实现操作可靠性,通过加工或焊接制成。 优选地,锁定杆中的孔(6)和延伸穿过锁定插座的横向通道(9)的孔(19a)相对于彼此具有偏心配置。
-
公开(公告)号:US20240150987A1
公开(公告)日:2024-05-09
申请号:US18226173
申请日:2023-07-25
申请人: OLIVIER NV
CPC分类号: E02D5/526 , F16L21/08 , E02D2200/1685 , E02D2600/20
摘要: Disclosed is an attachment system for detachably coupling a female tube end and a male tube end to each other to form foundation piles. The system includes
corresponding cylindrical sleeve holes in tube sleeves of the tube ends;
a coupling element which is fittable in the sleeve holes and rotatable through an angle therein;
a blocking pin on the coupling element or on one of the sleeve holes; and
a blocking slot in one of the sleeve holes or in the base body, so that the blocking pin engages in the blocking slot upon rotation of the coupling element in the sleeve holes,
Additionally, one of the sleeve holes and the base body can be provided with corresponding sleeve slots in order to form a fitting hole together to fit a blocking element therein, in order to prevent rotation of the coupling element in the sleeve holes.-
公开(公告)号:US20230332366A1
公开(公告)日:2023-10-19
申请号:US18302037
申请日:2023-04-18
申请人: Kok Huat TAY
发明人: Kok Huat TAY
IPC分类号: E02D5/52
CPC分类号: E02D5/526 , E02D2600/30 , E02D2600/20 , E02D2300/002
摘要: Two pile sections are joined together by interfitting means in their opposed ends. One pile has a plurality of lock bars (7a) extending substantially perpendicular to the end plate (3a), comprised of notches (14a, 14b) formed periphery at the lower portion (14). The other pile has a plurality of lock sockets (7b) mounted substantially perpendicular to the end plate (3b), comprised flaps (13a, 13b) within the cavity, formed from its opposed side walls and bending towards the axis of the lock socket cavity. When in splicing operation of the pile sections (1a, 1b), the lock bars (7a) are introduced into the lock sockets (7b). The locking bar (7a) then prised in between the flaps (13a, 13b) forcing them apart while the flaps (13a, 13b) still maintain its clamping force. The notches (14a, 14b) of the lock bars (7a) then engaged with lower the edges (15) of the flaps (13a, 13b) thus locking the piles together.
-
56.
公开(公告)号:US20230250605A1
公开(公告)日:2023-08-10
申请号:US18165605
申请日:2023-02-07
申请人: Allan P. HENDERSON
发明人: Allan P. HENDERSON
CPC分类号: E02D5/56 , E02D7/22 , E02D5/526 , E02D2250/003 , E02D2250/0038 , E02D2250/0046 , E02D2300/0018 , E02D2600/20 , E02D2600/30
摘要: An assembly and method of simultaneously spin drilling and pressure grouting a helical anchor into the ground vertically, horizontally or at an inclined angle create a continuous grouting configuration inside and outside the helical anchor for its entire depth in the ground. The helical anchor is configured to be partially or completely removed as desired and can be provided at its upper end with a tensioning element to post tension a cementitious foundation structure. A unique spin drilling and grouting assembly continuously provides grout under pressure to the interior of the helical anchor during its spin drilling into the ground. In one embodiment, the pressure grouted helical anchor is used with an upwardly extending tensioning element to reinforce cementitious foundation caps or other concrete support foundations.
-
公开(公告)号:US20230243117A1
公开(公告)日:2023-08-03
申请号:US18002641
申请日:2021-07-06
申请人: WRR Pedley & Co. Ltd
发明人: Charles Carver
CPC分类号: E02D5/526 , F16B7/0413 , E02D2600/20
摘要: Disclosed is a joint for connecting first and second elongate members together end to end, the joint comprising: a first connecting structure and a second connecting structure at an opposed end of the second elongate member; one of the first and second connecting structures comprising at least one male connector unit having a longitudinally projecting male part which is tapered in the longitudinal direction; the other of the first and second connecting structures having at least one female connector unit defining a correspondingly tapered recess into which the male part is received; the other of the first and second connecting structures defining lateral locking pin holes aligned either side of the recess and the male part having a corresponding lateral locking pin hole; and a locking pin insertable through the corresponding locking pin holes.
-
公开(公告)号:US09957684B2
公开(公告)日:2018-05-01
申请号:US15372196
申请日:2016-12-07
发明人: Paul Suver , Matthew E. Fenwick
CPC分类号: E02D5/526 , E02D5/24 , E02D7/00 , E02D2250/0023 , E02D2250/0038 , E02D2300/0023
摘要: A pile system for permafrost comprising a pilot hole, at least one pile, and frozen slurry. The pilot hole is formed to a pilot hole depth. The at least one pile is arranged at least partly within the pilot hole and extends to a pile string depth. The frozen slurry is within the pilot hole and is at least partly around the at least one pile.
-
公开(公告)号:US20180002884A1
公开(公告)日:2018-01-04
申请号:US15638053
申请日:2017-06-29
申请人: Hubbell Incorporated
摘要: Precast collars for screw type anchors that have a body made of a high strength composite or concrete material. The body having an opening to receive an anchor base head portion of an anchor so that a structure to be supported by the anchor is in direct contact with the anchor.
-
公开(公告)号:US20170241095A1
公开(公告)日:2017-08-24
申请号:US15588695
申请日:2017-05-08
申请人: James Lee
发明人: James Lee
CPC分类号: E02B17/0008 , E02B17/00 , E02B2017/0039 , E02D5/22 , E02D5/526 , E02D27/52 , E02D2200/1678 , E02D2200/1692 , E02D2300/0001 , E02D2300/002 , E02D2300/0029 , E02D2300/0051
摘要: A passive annular grout seal assembly is disclosed for sealing an annular opening between a driven pile and a skirt pile sleeve for an offshore platform. The annular seals are located at the bottom of the pile sleeves near sea floor and automatically activated when piles are inserted and driven through the pile sleeves without any active operational procedure during offshore piling. The seal configuration fully utilizes the seal height, the grout column height and the density difference between grout and sea water to produce enhanced sealing capacity against the column of grout above.
-
-
-
-
-
-
-
-
-