摘要:
Conventionally, there is a technique to conduct a cause analysis in which a single evaluation axis, such as a performance time, is used to configure a problem point network. However, in particular, in a system to visualize a management problem in which problems are intricately-intertwined with one another, information on multiple evaluation axes, collected from a business system, are utilized, and units are different for respective evaluation axes. Therefore, it is difficult to simply specify a cause of problem occurrence. In view of this situation, an object of the present invention is to extract and present factor which has a significant influence on the problem occurrence. The present invention is directed to an apparatus which stores causal relation information specifying the causal relation and the relation level between the indexes, business goal achievement level information, and an influence level of the causal relation, calculates the influence level by using the business goal achievement level information and the relation level of the causal relation, specifies as the causal index the index having a large influence, and generates screen information for displaying a graph and/or table relating to the causal index.
摘要:
Information that specifically points out quality problems in manufacturing processes can be provided to a supplier, thereby providing techniques capable of improving procurement quality. A present procurement quality improving system 1 has a calculating device 11 having a processing function of calculating problems of the manufacturing processes of the supplier and a data storage device 12. The data storage device 12 stores supplier QC process-chart information (D1), process FMEA information (D2) including quality related information, etc. The calculating device 11 has a matching calculating unit 111, which carries out a processing of associating D1 with D2, a first display calculating unit 112, which carries out a processing of presenting the information including quality problem information, etc. calculated by the association to the supplier, etc.
摘要:
Technology for realizing reductions in time required for production plan by estimating supply capacities of suppliers is provided. A system has a function of registering and displaying transaction information including delivery requests from a buyer including number of required parts and delivery responses from a supplier including number of suppliable parts, a function of managing the series of transaction information as transaction history information on a DB, and an estimating function of estimating supply capacities of parts of the supplier with respect to the delivery responses in reply to delivery requests. The estimating function performs processes of estimating supply capacities by determining numbers of suppliable parts of past delivery responses with respect to numbers of required parts of past delivery requests by using the delivery request history information, the delivery response history information and the process LT information, and outputting a screen including the estimated result information to users.
摘要:
A file transmitting apparatus carries out accepting client information of a client as a transmission target from a transmitting terminal 300 used by a client who is to transmit a file, identifying the client-specific application use authority information of the client as the transmission target in the storing device using the client information as accepted as a key, and storing the client-specific application use authority information as identified, accepting the file to be transmitted from the transmitting terminal 300, and transmitting information of the file to be transmitted with the client-specific application use authority information concerning the client as a transmission target stored in the storing device to an address of the terminal as a transmission target, and transmitting the file to be transmitted to a terminal address of the client as a transmission target according to an instruction from the transmitting terminal 300.
摘要:
This invention relates to a production planning system that judges whether or not production can be carried out in accordance not only with a request from a sales side and a demand forecast but also with a production request number or a maximum producible number of sets for each product. In the invention, production request number information of products, parts list information and information about inventory and inventory schedule of each of parts are accepted. When a calculation processing unit calculates a material necessary amount and makes a production plan of the product, it makes the production plan setting a production infeasible number as a new necessary number to a date later than a date designated by the production request information if any production infeasible number of sets exists. Surplus parts information not linked with the production plan is generated and a production addable number is calculated for each product.
摘要:
An information processing apparatus, a cost forecast calculation method, and a cost forecast calculation program are provided that enable the calculation of cost forecast without cost performance data such as initial inventory and warehousing schedule. The information processing apparatus includes: a reception unit for obtaining production plan data indicating the production plan of a product including date data; a plan change unit that changes the initial inventory data to the production plan data based on the product identification data and the plan identification data; and a cost calculation unit that calculate the cost.
摘要:
The system and method accepts the inputs of an aggregate (long-range) production plan draft, a profit and loss target, a sales target, and a stock target. Then, the accepted long-range production plan draft is deployed into master production schedule and then a feasibility of the long-range production schedule draft is simulated. Based on the simulated result, the system and method calculates an amended schedule, a predicted profit and loss, and predicted sales of the long-range production schedule draft. Further, a supply schedule is calculated on the middle-range production schedule draft deployed from the long-range plan draft. Based on the supply schedule, the middle-range production schedule draft, and a planned buying unit price, the system and method calculates a predicted stock, an estimated loss of inventory price decline, and a planned acquisition cost of inventory. Each calculated prediction data item is displayed on screen.
摘要:
A technique is provided that supports making evaluations of impact on a business performance indicator, which varies depending on timing at which a change of plan is decided. A sales plan evaluation support system, includes: a unit which obtains master information that includes a sales plan of a product and is used as input for material requirements planning (MRP) calculation; a first MRP calculating unit which obtains a first order-placement plan through MRP calculation by using the master information as input, the first order-placement plan including an ordered-item count and an order-placement date of a required item for the product; a revision timing setting unit which sets timing for revising the sales plan; a master modifying unit which modifies the master information; and a second MRP calculating unit which obtains a second order-placement plan through MRP calculation by using an order-placement plan having an order-placement date preceding the revision timing included in the first order-placement plan, as an order-placement plan which has been implemented prior to the revision timing, and by using, as input, master information modified by the master modifying unit, the second order-placement plan including an ordered-item count and an order-placement date of a required item for the product.
摘要:
Technology for realizing reductions in time required for production plan by estimating supply capacities of suppliers is provided. A system has a function of registering and displaying transaction information including delivery requests from a buyer including number of required parts and delivery responses from a supplier including number of suppliable parts, a function of managing the series of transaction information as transaction history information on a DB, and an estimating function of estimating supply capacities of parts of the supplier with respect to the delivery responses in reply to delivery requests. The estimating function performs processes of estimating supply capacities by determining numbers of suppliable parts of past delivery responses with respect to numbers of required parts of past delivery requests by using the delivery request history information, the delivery response history information and the process LT information, and outputting a screen including the estimated result information to users.
摘要:
A technique is provided that supports making evaluations of impact on a business performance indicator, which varies depending on timing at which a change of plan is decided. A sales plan evaluation support system, includes: a unit which obtains master information that includes a sales plan of a product and is used as input for material requirements planning (MRP) calculation; a first MRP calculating unit which obtains a first order-placement plan through MRP calculation by using the master information as input, the first order-placement plan including an ordered-item count and an order-placement date of a required item for the product; a revision timing setting unit which sets timing for revising the sales plan; a master modifying unit which modifies the master information; and a second MRP calculating unit which obtains a second order-placement plan through MRP calculation by using an order-placement plan having an order-placement date preceding the revision timing included in the first order-placement plan, as an order-placement plan which has been implemented prior to the revision timing, and by using, as input, master information modified by the master modifying unit, the second order-placement plan including an ordered-item count and an order-placement date of a required item for the product.