-
公开(公告)号:US08046252B2
公开(公告)日:2011-10-25
申请号:US11769827
申请日:2007-06-28
申请人: Maho Urano , Kentaro Taguchi
发明人: Maho Urano , Kentaro Taguchi
IPC分类号: G06F17/60
CPC分类号: G06Q10/087 , G06Q10/06312 , G06Q10/06314 , G06Q10/06315 , G06Q10/06393 , G06Q10/06395
摘要: A technique is provided that supports making evaluations of impact on a business performance indicator, which varies depending on timing at which a change of plan is decided. A sales plan evaluation support system, includes: a unit which obtains master information that includes a sales plan of a product and is used as input for material requirements planning (MRP) calculation; a first MRP calculating unit which obtains a first order-placement plan through MRP calculation by using the master information as input, the first order-placement plan including an ordered-item count and an order-placement date of a required item for the product; a revision timing setting unit which sets timing for revising the sales plan; a master modifying unit which modifies the master information; and a second MRP calculating unit which obtains a second order-placement plan through MRP calculation by using an order-placement plan having an order-placement date preceding the revision timing included in the first order-placement plan, as an order-placement plan which has been implemented prior to the revision timing, and by using, as input, master information modified by the master modifying unit, the second order-placement plan including an ordered-item count and an order-placement date of a required item for the product.
摘要翻译: 提供了一种技术,其支持对业绩绩效指标的影响进行评估,这取决于决定变更计划的时间。 销售计划评估支持系统包括:获取包含产品销售计划的主要信息并用作材料需求计划(MRP)计算输入的单位; 第一MRP计算单元,其通过使用主信息作为输入来通过MRP计算获得第一订单布置计划,第一订单布置计划包括订单项计数和产品的所需项目的订单放置日期; 修正定时设定单元,设定修正销售计划的时间; 主修改单元,其修改主信息; 以及第二MRP计算单元,其通过使用在第一订单安置计划中包括的修订时间之前的订单放置日期的订单安置计划,通过MRP计算获得第二订单安置计划,作为订单安置计划, 已经在修订时间之前实施,并且通过使用由主修改单元修改的主信息作为输入,第二订单布置计划包括订单项计数和产品所需项目的订单放置日期 。
-
公开(公告)号:US20080052143A1
公开(公告)日:2008-02-28
申请号:US11769827
申请日:2007-06-28
申请人: Maho Urano , Kentaro Taguchi
发明人: Maho Urano , Kentaro Taguchi
IPC分类号: G06Q10/00
CPC分类号: G06Q10/087 , G06Q10/06312 , G06Q10/06314 , G06Q10/06315 , G06Q10/06393 , G06Q10/06395
摘要: A technique is provided that supports making evaluations of impact on a business performance indicator, which varies depending on timing at which a change of plan is decided. A sales plan evaluation support system, includes: a unit which obtains master information that includes a sales plan of a product and is used as input for material requirements planning (MRP) calculation; a first MRP calculating unit which obtains a first order-placement plan through MRP calculation by using the master information as input, the first order-placement plan including an ordered-item count and an order-placement date of a required item for the product; a revision timing setting unit which sets timing for revising the sales plan; a master modifying unit which modifies the master information; and a second MRP calculating unit which obtains a second order-placement plan through MRP calculation by using an order-placement plan having an order-placement date preceding the revision timing included in the first order-placement plan, as an order-placement plan which has been implemented prior to the revision timing, and by using, as input, master information modified by the master modifying unit, the second order-placement plan including an ordered-item count and an order-placement date of a required item for the product.
摘要翻译: 提供了一种技术,其支持对业绩绩效指标的影响进行评估,这取决于决定变更计划的时间。 销售计划评估支持系统包括:获取包含产品销售计划的主要信息并用作材料需求计划(MRP)计算输入的单位; 第一MRP计算单元,其通过使用主信息作为输入来通过MRP计算获得第一订单布置计划,第一订单布置计划包括订单项计数和产品的所需项目的订单放置日期; 修正定时设定单元,设定修正销售计划的时间; 主修改单元,其修改主信息; 以及第二MRP计算单元,其通过使用在第一订单安置计划中包括的修订时间之前的订单放置日期的订单安置计划,通过MRP计算获得第二订单安置计划,作为订单安置计划, 已经在修订时间之前实施,并且通过使用由主修改单元修改的主信息作为输入,第二订单布置计划包括订单项计数和产品所需项目的订单放置日期 。
-
公开(公告)号:US5671148A
公开(公告)日:1997-09-23
申请号:US562846
申请日:1995-11-27
申请人: Maho Urano , Miho Yokota
发明人: Maho Urano , Miho Yokota
IPC分类号: G01R31/317 , G01R31/30 , G06F17/50 , H01L21/66 , H03K19/00 , H03K19/0944 , H03K17/60
CPC分类号: G01R31/30
摘要: An apparatus and method for checking logic circuit checks logic element influenced by hot carriers in the logic circuit. The present invention comprises means for measuring rising transition time t.sub.r (or falling transition time t.sub.f) of signal generated by logic element comprising one portion of the logic circuit; means for calculating a ratio (DUTY) of rising transition time t.sub.r (or falling transition time t.sub.f) and operation period T of the signal; and means for comparing said DUTY with maximum allowable duty (DUTYMAX), in order to detect the logic element having DUTY exceeding maximum allowable duty (DUTYMAX).
摘要翻译: 用于检查逻辑电路的装置和方法检查由逻辑电路中的热载波影响的逻辑元件。 本发明包括用于测量包括逻辑电路的一部分的逻辑元件产生的信号的上升跃迁时间tr(或下降转换时间tf)的装置; 用于计算信号的上升过渡时间tr(或下降转换时间tf)和操作周期T的比率(DUTY)的装置; 以及用于将所述DUTY与最大允许负载(DUTYMAX)进行比较的装置,以便检测DUTY超过最大允许负载(DUTYMAX)的逻辑元件。
-
-