-
公开(公告)号:US20250086368A1
公开(公告)日:2025-03-13
申请号:US18552435
申请日:2022-08-31
Inventor: Nan Liu , Xuemei Lin , Jianmin Wu , Hong Wang
IPC: G06F30/367
Abstract: Provided are a method of verifying process data of a display panel, a device, a storage medium, and a product, which relates to a field of process verification technology. The method of verifying the process data of the display panel includes: generating, based on design data of a process of the display panel, simulation process data for performing the process; performing, by using a process model, a simulation of performing the process based on the simulation process data; and verifying, by using a measurement model, whether the simulation process data is applicable to actual production based on the simulation. The process model is constructed based on actual process data generated in an actual manufacturing process of the display panel, and the measurement model is constructed based on actual process data and actual measurement data which are generated in the actual manufacturing process of the display panel.
-
公开(公告)号:US20240028983A1
公开(公告)日:2024-01-25
申请号:US18246891
申请日:2022-02-22
Inventor: Xieming Su , Xuemei Lin , Yang Li , Xixun Liu , Nan Liu , Chuan Wang , Zhai Lu , Guihao Liu , Hua Zhang , Hong Wang , Jianmin Wu
IPC: G06Q10/0631
CPC classification number: G06Q10/0631
Abstract: Provided are a method of production scheduling for a product, including: acquiring basic data for performing a production scheduling for the product; determining at least one production process from a plurality of production processes of the product as a bottleneck process according to the basic data; performing the production scheduling for the product using a linear programming solution model to obtain a first scheduling result of the product; merging a plurality of first entries corresponding to same products having production dates falling within a same time range into a second entry to obtain a plurality of second entries, wherein each of the second entries includes a production quantity of a same product in a time range; and acquiring orders corresponding to each product and sorting the orders of the product according to at least one of an order delivery date and an order priority to obtain an order sorting result.
-
3.
公开(公告)号:US20220318697A1
公开(公告)日:2022-10-06
申请号:US17311348
申请日:2020-09-03
Applicant: BOE Technology Group Co., Ltd.
Inventor: Nan Liu , Chuan Wang , Xuemei Lin , Jianmin Wu , Hong Wang
Abstract: An intelligent management system is provided. The intelligent management system includes an intelligent supply chain manager configured to generate supply chain limitations based on a supply chain knowledge graph comprising information of at least one of demand planning and forecasting, inventory planning, sales planning and forecasting, or budget planning; generate industry chain contingencies based on an industry chain event knowledge graph comprising information of at least one of event urgency level, event importance level, and event impact spread level; generate constraints on supply chain based on supply chain limitations and industry chain contingencies; and generate a proposal and provide the proposal to business systems for supply chain planning based on the constraints on supply chain, the proposal comprising proposal for at least one of demand re-planning and re-forecasting, inventory re-planning, sales re-planning and re-forecasting, or budget re-planning.
-
-