-
公开(公告)号:US20240175357A1
公开(公告)日:2024-05-30
申请号:US18532012
申请日:2023-12-07
发明人: John STEFFENINO
CPC分类号: E21D11/006 , E21D11/152 , G01N3/20
摘要: A polymer mesh for skin control in hard rock mining conditions is provided. The polymer mesh is manufactured using a knitted or woven design that further includes one or more pairs of solid cut-resistant bands. The bands are positioned in pairs, each band in a pair having a width of at least about 2.5″ and being generally parallel with the other band. The bands are spaced from one another at a distance of between about 1.5″ and about 4″ to create a reinforced aperture between the bands. One or more reinforcement bolts are installed within the aperture with the bands on opposing sides of each bolt buffering the edges of the steel plates associated with the bolts to prevent the plates from tearing the polymer mesh.
-
公开(公告)号:US11624280B2
公开(公告)日:2023-04-11
申请号:US17354134
申请日:2021-06-22
摘要: A polymer sheet adapted to attach to a material body such as a ceiling of a geological cavity and provide protective cover. The sheet comprises: a webbing portion defining a plurality of primary openings; and two margin portions extending along opposite edges of the sheet on either side of the webbing portion along a length of the sheet, each margin portion defining a plurality of secondary openings, wherein the margin portions are angled relative to the webbing portion.
-
公开(公告)号:US11333018B2
公开(公告)日:2022-05-17
申请号:US16862894
申请日:2020-04-30
发明人: John Steffenino
摘要: A polymer mesh for skin control in hard rock mining conditions is provided. The polymer mesh is manufactured using a knitted or woven design that further includes one or more pairs of solid cut-resistant bands. The bands are positioned in pairs, each band in a pair having a width of at least about 2.5″ and being generally parallel with the other band. The bands are spaced from one another at a distance of between about 1.5″ and about 4″ to create a reinforced aperture between the bands. One or more reinforcement bolts are installed within the aperture with the bands on opposing sides of each bolt buffering the edges of the steel plates associated with the bolts to prevent the plates from tearing the polymer mesh.
-
公开(公告)号:US11306588B2
公开(公告)日:2022-04-19
申请号:US17292152
申请日:2020-07-20
申请人: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY , CHINA COMMUNICATIONS CONSTRUCTION CO., LTD , QINGDAO WEST COAST RAIL TRANSIT CO., LTD , QINGDAO FIRST MUNICIPAL ENGINEERING CO., LTD , HEBEI FEIPU ENVIRONMENTAL PROTECTION TECHNOLOGY CO., LTD
发明人: Xianghui Meng , Shibin Jiang , Weizhou Li , Hailiang Wang , Fu Yu , Wensheng He , Quanwei Liu , Chuan Li , Zhenbiao Wang , Lin Xin , Biao Kong , Xiangbao Meng , Yong Zhang , Wenming Zhang , Lide Hou , Jiufang Xiong , Xuanshan Zhang
摘要: A method of treating tunnel collapse includes leveling a collapse body and moving a pavilion support under the collapse cavity, lifting a shield plate until a lower edge of the shield plate surpasses a contour line of an initial supporting arch of a tunnel, connecting a bottom column and inserting a padding plate under a column. If the hydraulic prop retracts, the column, the bottom column, the padding plate and the hydraulic prop bear a load from the shield plate. Mounting and connecting the initial supporting arch, welding the intersection point of the column and the initial supporting arch, cutting off the column in the initial supporting arch. Transferring the load of the shield plate from the pavilion support to an initial supporting shed, spraying fast-setting concrete to a grid arch to form a closed shell, and pumping filling material to fill the space of the collapse cavity.
-
公开(公告)号:US20210310355A1
公开(公告)日:2021-10-07
申请号:US17354134
申请日:2021-06-22
摘要: A polymer sheet adapted to attach to a material body such as a ceiling of a geological cavity and provide protective cover. The sheet comprises: a webbing portion defining a plurality of primary openings; and two margin portions extending along opposite edges of the sheet on either side of the webbing portion along a length of the sheet, each margin portion defining a plurality of secondary openings, wherein the margin portions are angled relative to the webbing portion.
-
公开(公告)号:US10851651B2
公开(公告)日:2020-12-01
申请号:US16079192
申请日:2016-02-24
发明人: Andreas Bischof , Thomas Galler , Martin Kupper
摘要: A mesh handler for a mining machine includes a generally U-shaped frame arranged for receiving and positioning at least one mesh against a roof portion of an underground tunnel. The frame includes at least one generally U-shaped rail and a guide mechanism arranged for guiding the mesh along the rail in a direction substantially perpendicular to a longitudinal direction of the mining machine. Moreover, a mining machine including the mesh handler is provided.
-
7.
公开(公告)号:US20190218910A1
公开(公告)日:2019-07-18
申请号:US16319880
申请日:2017-10-31
发明人: Kegong FAN , Chunyuan JING , Shengming NIU , Deli FAN , Chuanwei ZANG
IPC分类号: E21D11/15
CPC分类号: E21D11/152 , E21D11/14 , E21D11/155 , E21D20/02
摘要: An asymmetric support structure of entry driven along, gob-side (EDG) under unstable roof in deep mines and construction method thereof. The asymmetric support structure includes roadway roof support structure, a gob-side support structure and a solid coal seam-side support structure. The roadway roof support structure includes a reinforcing wire mesh, a W-section steel strap, high-strength pretensioned bolts, and cable bolts and matching steel straps. The gob-side support structure includes a reinforcing wire mesh, a W-section steel strap, high-strength pretensioned yielding bolts and grouting cable bolts and its matching steel straps. The solid coal seam-side support structure includes a reinforcing wire mesh, a reinforced beam and steel strap pallet subassembly, high-strength pretensioned yielding bolts and cable bolts and its matching steel straps. The roadway roof support structure, gob-side support structure and solid coal seam-side support structure beneficially together form the asymmetric support structure.
-
公开(公告)号:US20190048719A1
公开(公告)日:2019-02-14
申请号:US16079192
申请日:2016-02-24
发明人: Andreas BISCHOF , Thomas GALLER , Martin KUPPER
摘要: A mesh handler for a mining machine includes a generally U-shaped frame arranged for receiving and positioning at least one mesh against a roof portion of an underground tunnel. The frame includes at least one generally U-shaped rail and a guide mechanism arranged for guiding the mesh along the rail in a direction substantially perpendicular to a longitudinal direction of the mining machine. Moreover, a mining machine including the mesh handler is provided.
-
公开(公告)号:US20180216406A1
公开(公告)日:2018-08-02
申请号:US15748129
申请日:2016-07-27
申请人: Andre VAN DYK
发明人: Andre VAN DYK
CPC分类号: E21B7/025 , E21D9/006 , E21D11/152 , E21D11/403 , F42D3/04
摘要: The invention provides a machine for tunnelling in rock. The machine includes a pilot drill assembly for drilling a series of interfering parallel holes or a pilot hole into and generally perpendicular into a rock face and a blast hole drill assembly for drilling a series of blasting holes around the pilot hole or previous blast hole. The machine further includes a charge handling and loading assembly for loading the first series of holes with propellant charges and an ignitor system for igniting the charges. Included further is a rock clearing means for removing the blast rock from the blast face and a rock pick for clearing and picking the floor, roof or walls to provide access for the machine into the tunnel and a mobility assembly for moving the machine forward. Also included is a control console provided with control means for controlling the pilot drill assembly, blast hole drill assembly, charge handling and loading assembly, ignitor system, rock clearing means, the rock pick, a measure system for gas detection and management, a rock stress measure system and recording system.
-
公开(公告)号:US20150104261A1
公开(公告)日:2015-04-16
申请号:US14381461
申请日:2013-02-08
CPC分类号: E21D11/152 , E21D17/006 , E21D21/00
摘要: A method for lining mining and tunnel constructions with a support material (20) comprises the steps of: •a. providing a plurality of lay wires (24) in the long direction; •b. providing a plurality of stay wires (22) in the cross direction, the stay wires making intersections with said lay wires (24); •c. providing knot wires (28) to attach the lay wires (24) to the stay wires (22) in at least some of the intersections so as to form the support material; •d. installing the support material (20) against a ceiling or a wall of a mining or tunnel construction by means of bolts.
摘要翻译: 用支撑材料(20)衬砌采矿和隧道结构的方法包括以下步骤:a。 在长方向上设置多个铺设线(24); •b。 在横向上设置多条拉丝(22),所述拉丝线与所述铺设线(24)交叉; •C。 提供结线(28)以将布线(24)附接到至少一些相交处的拉丝(22),以形成支撑材料; •d。 通过螺栓将支撑材料(20)安装在采矿或隧道结构的天花板或墙壁上。
-
-
-
-
-
-
-
-
-