-
公开(公告)号:US20190048849A1
公开(公告)日:2019-02-14
申请号:US16076564
申请日:2017-02-10
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Jacob Deleuran GRUNNET , Damien CASTAIGNET , Keld HAMMERUM , Kasper ZINCK
Abstract: A method of controlling a wind turbine is described. The method comprises calculating a current wear rate for each of the main bearing of a turbine rotor and the blade bearings of rotor blades mounted on the turbine rotor, and calculating a blade pitch adjustment of the rotor blades to achieved a desired ratio between main bearing wear and blade bearing wear in dependence on the calculated current wear rates of the main bearing and the blade bearings.
-
公开(公告)号:US20190003457A1
公开(公告)日:2019-01-03
申请号:US16063576
申请日:2016-12-12
Applicant: VESTAS WIND SYSTEMS A/S
CPC classification number: F03D7/042 , F03D1/02 , F03D7/0224 , F03D7/026 , F03D7/0264 , F03D7/0296 , F05B2260/74 , F05B2260/85 , F05B2260/90 , F05B2270/1095 , F05B2270/111 , F05B2270/32 , F05B2270/327 , F05B2270/328 , F05B2270/335 , Y02E10/723
Abstract: There is presented a wind turbine system, wherein the wind turbine system is comprising a support structure, a plurality of wind turbine modules mounted to the support structure wherein each of the plurality of wind turbine modules comprises a rotor, and wherein the wind turbine system further comprises a control system, wherein the control is arranged to execute a wind turbine system transition from a first system operational state of the wind turbine system to a second system operational state of the wind turbine system, and wherein the wind turbine system transition is performed by executing a plurality of wind turbine module transitions from a first module operational state of a wind turbine module to a second module operational state of the wind turbine module wherein the plurality of wind turbine module transitions are distributed in time with respect to each other.
-