Method for regulating the level of a dam installation and dam installation implementing the method
    1.
    发明申请
    Method for regulating the level of a dam installation and dam installation implementing the method 失效
    调整大坝安装水平的方法和实施该方法的大坝安装

    公开(公告)号:US20040247393A1

    公开(公告)日:2004-12-09

    申请号:US10862431

    申请日:2004-06-08

    Abstract: Method of regulating a water level of a dam installation having a plurality of turbine generator units arranged to generate electrical power, wherein at least some of the plurality of turbine generator units are arranged at least one of one above another and one beside another so as to form at least one turbine generator module. The method includes regulating, at least to some extent, the water level to a predefinable set point by starting or stopping at least one of the plurality of turbine generator units and adjusting, in discrete steps, a quantity of water which can flow through the dam installation, wherein a discrete step is defined by a quantity of water which can flow through a defined number of turbine generator units. This Abstract is not intended to define the invention disclosed in the specification, nor intended to limit the scope of the invention in any way.

    Abstract translation: 调节具有布置成产生电力的多个涡轮发电机单元的水坝装置的水位的方法,其中所述多个涡轮发电机单元中的至少一些涡轮发电机单元中的至少一个布置在另一个之上的至少一个, 形成至少一个涡轮发电机模块。 该方法包括至少在一定程度上通过启动或停止多个涡轮发电机单元中的至少一个来调节到可预定的设定点的水位,并以离散的步骤调节可流过大坝的水量 安装,其中离散步骤由能够流过限定数量的涡轮发电机单元的水量定义。 本摘要不旨在限定说明书中公开的发明,也不旨在以任何方式限制本发明的范围。

    Method for producing a hydropower plant
    2.
    发明申请
    Method for producing a hydropower plant 失效
    水电站生产方法

    公开(公告)号:US20040222641A1

    公开(公告)日:2004-11-11

    申请号:US10865781

    申请日:2004-06-14

    Inventor: Heinz Panholzer

    Abstract: Method for producing a device for obtaining electrical energy from hydropower and a method for modifying a dam, in which, at a remote production site, at least two turbine-generating units, comprising a turbine and a generator connected to it, are produced, at a remote production site at least two turbine-generator units are connected to one another to form at least one module comprising at least two turbine-generator units, at least one module is transported from the production site over a distance to the site of use by a transport, and, at the site of use, the at least one module is lifted off the transport by a lifting fixture and is moved into a position which is provided for its operation. The instant abstract is neither intended to define the invention disclosed in this specification nor intended to limit the scope of the invention in any way.

    Abstract translation: 一种用于从水力发电获得电能的装置的方法和一种用于修改坝的方法,其中在远程生产现场,至少两个包括与其相连的涡轮机和发电机的涡轮发电机组产生在 远程生产现场至少两个涡轮发电机单元彼此连接以形成至少一个包括至少两个涡轮发电机单元的模块,至少一个模块从生产现场通过一段距离运输到使用地点 运输工具,并且在使用现场,至少一个模块通过提升固定装置从运输工具上卸下,并被移动到为其操作提供的位置。 本摘要既不旨在限定本说明书中公开的发明,也不旨在以任何方式限制本发明的范围。

Patent Agency Ranking