-
公开(公告)号:US12173581B2
公开(公告)日:2024-12-24
申请号:US16063356
申请日:2016-12-09
Applicant: SCHLUMBERGER TECHNOLOGY CORPORATION
Inventor: Martinus Johannes Bernardus Bogaerts , Stephen Paul Bracken , Gioconda Tovar , Jose Raul Contreras Escalante , Thilagawathy Nadaraja , Pavel Nyaga , Edward Smetak , Andrew Whiddon
Abstract: A method for performing an integrated cementing operation at a wellsite is disclosed. The method involves simulating a cementing operation including pumping sequences for selectively pumping drilling fluid and cement into the wellbore according to pre-operation simulated pumping parameters, measuring real-time pumping parameters of the drilling fluid and the cement according to the pumping sequences, during the measuring, simulating real-time pumping parameters for each of the defined pumping sequences based on the measured real-time pumping parameters, and comparing the real-time simulated pumping parameters with the pre-operation simulated pumping parameters. The method may also involve measuring a return flow rate of fluid flowing out of the wellbore, defining a loss zone within the wellbore, simulating the return flow rate based on the input flow rate, and generating a rate of the fluid loss such that the simulated return flow rate equals the actual return flow rate.
-
公开(公告)号:US20170002622A1
公开(公告)日:2017-01-05
申请号:US14791201
申请日:2015-07-02
Applicant: Schlumberger Technology Corporation
Inventor: Gunnar Gerard De Bruijn , Pavel Nyaga , Edward Smetak , Andrew Whiddon , Jose Contreras Escalante , Nicolas Flamant
IPC: E21B33/13
CPC classification number: E21B33/14
Abstract: Cement placement simulations and post-placement simulations are traditionally performed before the cementing operation takes place. Several simulation iterations may be performed, allowing engineers to develop an optimal cement treatment design. When the cementing operation takes place, engineers may follow the procedure prescribed by the simulator. After the operation is complete and the cement has set, logging operations may be performed to verify that the goals of the cementing operation have been met. Monitoring the progress of the cementing operation in real time allows a determination of whether cementing events are unfolding as predicted by the simulator. If deviations from the plan occur, some real-time adjustments may be made to improve cementing results.
Abstract translation: 传统上,在固井操作发生之前进行水泥放置模拟和后置放置模拟。 可以进行几次模拟迭代,允许工程师开发最佳的水泥处理设计。 当固井操作发生时,工程师可以遵循模拟器规定的程序。 操作完成并且水泥固化后,可以进行测井操作,以验证固井作业的目标是否得到满足。 实时监测固井作业的进度可以确定固井事件是否按照模拟器的预测展开。 如果发生偏离计划,可能会进行一些实时调整,以改善固井效果。
-