CONSERVING POWER THROUGH WORK LOAD ESTIMATION FOR A PORTABLE COMPUTING DEVICE USING SCHEDULED RESOURCE SET TRANSITIONS
    2.
    发明申请
    CONSERVING POWER THROUGH WORK LOAD ESTIMATION FOR A PORTABLE COMPUTING DEVICE USING SCHEDULED RESOURCE SET TRANSITIONS 有权
    通过使用调度资源设置转换的便携式计算设备的工作负荷估算来保持功率

    公开(公告)号:US20140173621A1

    公开(公告)日:2014-06-19

    申请号:US14188077

    申请日:2014-02-24

    Abstract: A start time to begin transitioning resources to states indicated in the second resource state set is scheduled based upon an estimated amount of processing time to complete transitioning the resources. At a scheduled start time, a process starts in which the states of one or more resources are switched from states indicated by the first resource state set to states indicated by the second resource state set. Scheduling the process of transitioning resource states to begin at a time that allows the process to be completed just in time for the resource states to be immediately available to the processor upon entering the second application state helps minimize adverse effects of resource latency. This calculation for the time that the process should be completed just in time may be enhanced when system states and transitions between states are measured accurately and stored in memory of the portable computing device.

    Abstract translation: 基于估计的完成资源转换的处理时间量来调度开始向第二资源状态集合指示的状态转换资源的开始时间。 在预定的开始时间,开始一个或多个资源的状态从由第一资源状态设置指示的状态切换到由第二资源状态集合指示的状态的过程。 调度资源状态转换过程的开始,这样一来,在进入第二应用程序状态时,可以及时完成资源状态立即可用的进程,从而最大限度地减少资源等待时间的不利影响。 当系统状态和状态之间的转换被精确地测量并存储在便携式计算设备的存储器中时,可以在时间上完成该过程应该完成的时间的计算。

Patent Agency Ranking