Method and software for controlling just in time item production via kanban cards
    1.
    发明授权
    Method and software for controlling just in time item production via kanban cards 有权
    方法和软件,用于通过看板卡控制即时产品的生产

    公开(公告)号:US08805564B2

    公开(公告)日:2014-08-12

    申请号:US13337644

    申请日:2011-12-27

    IPC分类号: G06F17/00

    摘要: A method and a system control just in time item production via kanban cards. The items are transformed according to a flow shop containing a raw material buffer followed by a sequence of production pairs containing one workstation and an assigned buffer. A local buffer threshold parameter is provided and denotes the desired safety stock of the items of the specific type in the buffer. A global demand threshold parameter is provided and denotes the quantity of items of the specific item type required along the downstream process to satisfy the estimated demand. Whenever a kanban card is associated to an item of a specific type switches status, it is assigned one of four priority levels indicating the priority level of the production request. At each production pair, an item is produced of a type whose priority level is the highest according to a given priority model.

    摘要翻译: 通过看板卡在时间项目制作中的方法和系统控制。 这些物品根据包含原料缓冲区的流动车间进行变换,之后是包含一个工作站和分配的缓冲区的一系列生产对。 提供本地缓冲区阈值参数,并表示缓冲器中特定类型的项目的期望安全库存。 提供了全局需求阈值参数,并且表示沿着下游流程所需的满足估计需求的特定项目类型的项目数量。 每当看板卡与特定类型的交换机状态的项目相关联时,它被分配为指示生产请求的优先级的四个优先级中的一个。 在每个生产对中,根据给定的优先级模型,产生一个优先级最高的类型的项。

    METHOD FOR PRODUCTION SCHEDULING IN A MANUFACTURING EXECUTION SYSTEM OF A SHOP FLOOR
    2.
    发明申请
    METHOD FOR PRODUCTION SCHEDULING IN A MANUFACTURING EXECUTION SYSTEM OF A SHOP FLOOR 审中-公开
    生产调度方法在商场制造业执行系统中的应用

    公开(公告)号:US20090093902A1

    公开(公告)日:2009-04-09

    申请号:US12244265

    申请日:2008-10-02

    IPC分类号: G06F19/00

    CPC分类号: G06Q10/06

    摘要: In a method for production planning in a manufacturing execution system of a shop floor, the following steps are performed: obtaining shop floor data from the shop floor; analyzing the shop floor data using detection logic to detect a disturbance and to provide an opportunity for a corrective action; and generating a production schedule based on the detected disturbance and opportunity for a corrective action by a scheduler.

    摘要翻译: 在车间的制造执行系统中的生产计划方法中,执行以下步骤:从车间获取车间数据; 使用检测逻辑分析车间数据以检测扰动并提供校正动作的机会; 以及基于检测到的干扰和机会来生成调度器的校正动作的生产调度。

    Method of controlling a production process
    3.
    发明授权
    Method of controlling a production process 有权
    控制生产过程的方法

    公开(公告)号:US07970484B2

    公开(公告)日:2011-06-28

    申请号:US12254252

    申请日:2008-10-20

    申请人: Paolo Fontanot

    发明人: Paolo Fontanot

    IPC分类号: G06F19/00 G06F7/00

    摘要: In order to increase the efficiency of a production process a new method is presented. Thereby a flow of items is generated in a production system. Electronic devices that are attachable to the items are used for tracking the items. An identification of a first electronic device attached to a first item is read out. The identification is forwarded to a computer system that steers the flow of items. Due to a reception of the identification by the computer system, a transport status indicating authorization or prohibition to process the second item is set. The transport status is then transmitted to a second electronic device with an authorizing signal that is sent from the computer system to the second electronic device. The second electronic device contains a signal receiver circuit for receiving the authorizing signal and the second electronic device is attached to the second item.

    摘要翻译: 为了提高生产过程的效率,提出了一种新的方法。 从而在生产系统中产生物品流。 用于跟踪物品的电子设备可以附加到物品上。 读取附接到第一项目的第一电子设备的标识。 该识别被转发到引导物品流动的计算机系统。 由于接收到计算机系统的识别,所以设置指示处理第二项目的授权或禁止的传送状态。 然后将传输状态发送到具有从计算机系统发送到第二电子设备的授权信号的第二电子设备。 第二电子设备包含用于接收授权信号的信号接收器电路,并且第二电子设备附接到第二项。

    METHOD FOR SCHEDULING A PRODUCTION PROCESS BY SUPPORTING THE VISUALIZATION OF MATERIAL SHORTAGES
    4.
    发明申请
    METHOD FOR SCHEDULING A PRODUCTION PROCESS BY SUPPORTING THE VISUALIZATION OF MATERIAL SHORTAGES 有权
    通过支持材料短期可视化来调度生产过程的方法

    公开(公告)号:US20100217419A1

    公开(公告)日:2010-08-26

    申请号:US12701870

    申请日:2010-02-08

    申请人: Paolo Fontanot

    发明人: Paolo Fontanot

    IPC分类号: G06F19/00

    CPC分类号: G06Q10/06

    摘要: A method for scheduling a production process is disclosed, wherein a production order requiring components is placed on a production schedule, the availabilities of the components, which are required for the production order, are detected by a computing unit, production orders requesting one or more of the components are classified depending on the availabilities of the corresponding components, and the production order is displayed with a first optically observable marker if the order requests a missing component and/or produces a missing component.

    摘要翻译: 公开了一种调度生产过程的方法,其中需要组件的生产订单被放置在生产计划中,生产订单所需的部件的可用性由计算单元检测,生产订单请求一个或多个 的组件根据相应组件的可用性进行分类,并且如果顺序请求丢失的组件和/或产生缺少组件,则生产顺序与第一光学可观察标记一起显示。

    Device for Electronic Identification of Items
    5.
    发明申请
    Device for Electronic Identification of Items 审中-公开
    物品电子识别装置

    公开(公告)号:US20090102613A1

    公开(公告)日:2009-04-23

    申请号:US12254308

    申请日:2008-10-20

    申请人: Paolo Fontanot

    发明人: Paolo Fontanot

    IPC分类号: H04B7/00

    摘要: A device for electronic identification of items has a signal receiver circuit and a visual signaling unit that, based on a received signal, indicates a transport status of an item to which the device for electronic identification of items is attachable. The device provides a way for enhancing the identification, tracking and transportation of items for logistical purposes.

    摘要翻译: 用于物品的电子识别的装置具有信号接收器电路和可视信号单元,该信号接收器电路和视觉信号单元基于接收到的信号来指示用于电子识别物品的装置可附接到的物品的传送状态。 该设备提供了一种增强物品识别,跟踪和运输的方法,用于物流。

    Method and a system for executing a scheduled production process
    6.
    发明授权
    Method and a system for executing a scheduled production process 失效
    用于执行预定生产过程的方法和系统

    公开(公告)号:US08788082B2

    公开(公告)日:2014-07-22

    申请号:US12876470

    申请日:2010-09-07

    申请人: Paolo Fontanot

    发明人: Paolo Fontanot

    IPC分类号: G06F19/00

    CPC分类号: G06Q10/06

    摘要: A method and a system execute a scheduled production process having an execution duration within a production schedule executed by a manufacturing execution system. The method includes defining within the production process a resource required for the execution of the production process and defining for the resource a sequence-dependent setup sub-process having a setup duration, a productive sub-process and a sequence-dependent teardown sub-process. The production process is scheduled with a start-time. At a predetermined period at the start-time of the production process, the production process for dispatching and subsequent executing is confirmed. In response to the confirmation, individual production processes are created for the sequence-dependent setup sub-process, the production sub-process and the teardown sub-process. The created individual production processes are linked together by precedence constraints defining a sequence of the created individual production processes. The production schedule is rescheduled through replacing the production process by the created individual production processes.

    摘要翻译: 一种方法和系统执行具有由制造执行系统执行的生产计划内的执行持续时间的调度生产过程。 该方法包括在生产过程中定义执行生产过程所需的资源,并为资源定义具有建立持续时间,生产子过程和序列依赖拆卸子过程的依赖于顺序的设置子过程 。 生产过程安排了开始时间。 在生产过程开始时的预定时间段,确认了调度和后续执行的生产过程。 响应于确认,针对顺序依赖的设置子过程,生产子过程和拆卸子过程创建单独的生产过程。 所创建的单个生产过程通过定义所创建的单独生产过程的顺序的优先约束来链接在一起。 通过由创建的单个生产流程替换生产过程来重新安排生产计划。

    Method for scheduling a production process by supporting the visualization of material shortages
    7.
    发明授权
    Method for scheduling a production process by supporting the visualization of material shortages 有权
    通过支持材料短缺的可视化来安排生产过程的方法

    公开(公告)号:US08428760B2

    公开(公告)日:2013-04-23

    申请号:US12701870

    申请日:2010-02-08

    申请人: Paolo Fontanot

    发明人: Paolo Fontanot

    IPC分类号: G06F19/00

    CPC分类号: G06Q10/06

    摘要: A method for scheduling a production process is disclosed, wherein a production order requiring components is placed on a production schedule, the availabilities of the components, which are required for the production order, are detected by a computing unit, production orders requesting one or more of the components are classified depending on the availabilities of the corresponding components, and the production order is displayed with a first optically observable marker if the order requests a missing component and/or produces a missing component.

    摘要翻译: 公开了一种调度生产过程的方法,其中需要组件的生产订单被放置在生产计划中,生产订单所需的部件的可用性由计算单元检测,生产订单请求一个或多个 的组件根据相应组件的可用性进行分类,并且如果顺序请求丢失的组件和/或产生缺少组件,则生产顺序与第一光学可观察标记一起显示。

    METHOD FOR MODELLING A MANUFACTURING PROCESS
    8.
    发明申请
    METHOD FOR MODELLING A MANUFACTURING PROCESS 审中-公开
    制造过程建模方法

    公开(公告)号:US20100070062A1

    公开(公告)日:2010-03-18

    申请号:US12562746

    申请日:2009-09-18

    申请人: Paolo Fontanot

    发明人: Paolo Fontanot

    IPC分类号: G06F17/00

    摘要: A method models a manufacturing process. The modelling is performed by a business layer and an execution layer. The method includes defining a generic equipment class containing a first placeholder, defining at least one generic process segment class associated with the generic equipment class and containing a second placeholder, defining a specific equipment sub class derived from the generic equipment class, and defining a specific process segment sub class derived from the generic process segment class. The specific process segment sub class is associated with the specific equipment sub class and models the manufacturing process by using the first and second placeholder on the business layer. The business layer is responsible for planning decisions at the level of the placeholders representing the generic classes of equipment and process segments. The execution layer is responsible of scheduling decisions at the level of the specific sub classes of equipment and process segments.

    摘要翻译: 一种制造过程的模型。 建模由业务层和执行层执行。 该方法包括定义包含第一占位符的通用设备类,定义与通用设备类相关联并包含第二占位符的至少一个通用过程段类,定义从通用设备类导出的特定设备子类,并定义特定设备类 从通用进程段类派生的进程段子类。 具体的进程段子类与特定的设备子类相关联,并通过在业务层上使用第一个和第二个占位符对制造过程进行建模。 业务层负责代表设备和流程部分通用类别的占位符级别的规划决策。 执行层负责设备和处理段的特定子类级别的调度决策。

    Method of Controlling a Production Process
    9.
    发明申请
    Method of Controlling a Production Process 有权
    控制生产过程的方法

    公开(公告)号:US20090105866A1

    公开(公告)日:2009-04-23

    申请号:US12254252

    申请日:2008-10-20

    申请人: Paolo Fontanot

    发明人: Paolo Fontanot

    IPC分类号: G05B19/00 G06F17/00

    摘要: In order to increase the efficiency of a production process a new method is presented. Thereby a flow of items is generated in a production system. Electronic devices that are attachable to the items are used for tracking the items. An identification of a first electronic device attached to a first item is read out. The identification is forwarded to a computer system that steers the flow of items. Due to a reception of the identification by the computer system, a transport status indicating authorization or prohibition to process the second item is set. The transport status is then transmitted to a second electronic device with an authorizing signal that is sent from the computer system to the second electronic device. The second electronic device contains a signal receiver circuit for receiving the authorizing signal and the second electronic device is attached to the second item.

    摘要翻译: 为了提高生产过程的效率,提出了一种新的方法。 从而在生产系统中产生物品流。 用于跟踪物品的电子设备可以附加到物品上。 读取附接到第一项目的第一电子设备的标识。 该识别被转发到引导物品流动的计算机系统。 由于接收到计算机系统的识别,所以设置指示处理第二项目的授权或禁止的传送状态。 然后将传输状态发送到具有从计算机系统发送到第二电子设备的授权信号的第二电子设备。 第二电子设备包含用于接收授权信号的信号接收器电路,并且第二电子设备附接到第二项。