MANAGING PRODUCTION PIPELINES
    3.
    发明公开

    公开(公告)号:US20240257002A1

    公开(公告)日:2024-08-01

    申请号:US18630897

    申请日:2024-04-09

    CPC classification number: G06Q10/06312

    Abstract: A method for management of a production pipeline is disclosed. The method may comprise accessing a data model which comprises a plurality of data objects, including one or more assembly objects, each assembly object representing a part to undergo one or more production events to be performed on a part at a first party facility for providing to a second party facility and one or more production event objects, each production event object representing a particular production event and having a plurality of properties, including an associated start time property and an end time property. The method may also comprise receiving selection of one or more production event objects to be linked to a first assembly object and an indication of values for at least the start time property and end time property of the one or more production event objects and receiving input of one or more alert conditions to be linked to the first assembly object. The method may also comprise receiving first input data in relation to one or more of the production event objects that modifies one or both of the start and end time values and determining that the modification meets an alert condition linked to the assembly object. The method may also comprise issuing an alert to a user interface responsive to the determination.

    Managing production pipelines
    4.
    发明授权

    公开(公告)号:US11983651B2

    公开(公告)日:2024-05-14

    申请号:US17446236

    申请日:2021-08-27

    CPC classification number: G06Q10/06312

    Abstract: A method for management of a production pipeline is disclosed. The method may comprise accessing a data model which comprises a plurality of data objects, including one or more assembly objects, each assembly object representing a part to undergo one or more production events to be performed on a part at a first party facility for providing to a second party facility and one or more production event objects, each production event object representing a particular production event and having a plurality of properties, including an associated start time property and an end time property. The method may also comprise receiving selection of one or more production event objects to be linked to a first assembly object and an indication of values for at least the start time property and end time property of the one or more production event objects and receiving input of one or more alert conditions to be linked to the first assembly object. The method may also comprise receiving first input data in relation to one or more of the production event objects that modifies one or both of the start and end time values and determining that the modification meets an alert condition linked to the assembly object. The method may also comprise issuing an alert to a user interface responsive to the determination.

    RELATIONSHIP ANALYSIS AND MAPPING FOR INTERRELATED MULTI-LAYERED DATASETS

    公开(公告)号:US20220237204A1

    公开(公告)日:2022-07-28

    申请号:US17723460

    申请日:2022-04-19

    Abstract: Systems and methods are provided for analyzing and visualizing relationship of multi-layered datasets. A system stores original datasets in a datastore. The system generates first derivative datasets from the original datasets, and generates second derivative datasets from at least the first derivative datasets. The system determines relationships among the original datasets, the first derivative datasets, and the second derivative datasets, based on an analytical relationship between two datasets, a similarity relationship between two datasets, a modification relationship between two datasets, and a user-interaction relationship between two datasets. Then, the system generates a node map including at least part of the original datasets, the first derivative datasets, and the second derivative datasets as a node, and at least part of the determined analytical, similarity, modification, and user-interaction relationships between two nodes as a link.

    Relationship analysis and mapping for interrelated multi-layered datasets

    公开(公告)号:US10769171B1

    公开(公告)日:2020-09-08

    申请号:US15900301

    申请日:2018-02-20

    Abstract: Systems and methods are provided for analyzing and visualizing relationship of multi-layered datasets. A system stores original datasets in a datastore. The system generates first derivative datasets from the original datasets, and generates second derivative datasets from at least the first derivative datasets. The system determines relationships among the original datasets, the first derivative datasets, and the second derivative datasets, based on an analytical relationship between two datasets, a similarity relationship between two datasets, a modification relationship between two datasets, and a user-interaction relationship between two datasets. Then, the system generates a node map including at least part of the original datasets, the first derivative datasets, and the second derivative datasets as a node, and at least part of the determined analytical, similarity, modification, and user-interaction relationships between two nodes as a link.

    Relationship analysis and mapping for interrelated multi-layered datasets

    公开(公告)号:US11874850B2

    公开(公告)日:2024-01-16

    申请号:US17723460

    申请日:2022-04-19

    CPC classification number: G06F16/26 G06F16/2264 G06F16/288

    Abstract: A system stores original datasets in a datastore. The system generates first derivative datasets from the original datasets, and generates second derivative datasets from at least the first derivative datasets. The system determines relationships among the original datasets, the first derivative datasets, and the second derivative datasets, based on an analytical relationship between two datasets, a similarity relationship between two datasets, a modification relationship between two datasets, and a user-interaction relationship between two datasets. Then, the system generates a node map including at least part of the original datasets, the first derivative datasets, and the second derivative datasets as a node, and at least part of the determined analytical, similarity, modification, and user-interaction relationships between two nodes as a link.

    Relationship analysis and mapping for interrelated multi-layered datasets

    公开(公告)号:US11308117B2

    公开(公告)日:2022-04-19

    申请号:US17013510

    申请日:2020-09-04

    Abstract: A system stores original datasets in a datastore. The system generates first derivative datasets from the original datasets, and generates second derivative datasets from at least the first derivative datasets. The system determines relationships among the original datasets, the first derivative datasets, and the second derivative datasets, based on an analytical relationship between two datasets, a similarity relationship between two datasets, a modification relationship between two datasets, and a user-interaction relationship between two datasets. Then, the system generates a node map including at least part of the original datasets, the first derivative datasets, and the second derivative datasets as a node, and at least part of the determined analytical, similarity, modification, and user-interaction relationships between two nodes as a link.

    MANAGING PRODUCTION PIPELINES
    9.
    发明申请

    公开(公告)号:US20220067609A1

    公开(公告)日:2022-03-03

    申请号:US17446236

    申请日:2021-08-27

    Abstract: A method for management of a production pipeline is disclosed. The method may comprise accessing a data model which comprises a plurality of data objects, including one or more assembly objects, each assembly object representing a part to undergo one or more production events to be performed on a part at a first party facility for providing to a second party facility and one or more production event objects, each production event object representing a particular production event and having a plurality of properties, including an associated start time property and an end time property. The method may also comprise receiving selection of one or more production event objects to be linked to a first assembly object and an indication of values for at least the start time property and end time property of the one or more production event objects and receiving input of one or more alert conditions to be linked to the first assembly object. The method may also comprise receiving first input data in relation to one or more of the production event objects that modifies one or both of the start and end time values and determining that the modification meets an alert condition linked to the assembly object. The method may also comprise issuing an alert to a user interface responsive to the determination.

Patent Agency Ranking