公开(公告)号:US20220284519A1
公开(公告)日:2022-09-08
申请号:US17826635
申请日:2022-05-27
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Payal Pancholi , Abhishek Gupta , James P. Kummer , Michael J. Wenzel , Michael J. Risbeck
Abstract: Systems and methods for controlling building equipment include simulating operation of the building equipment at a plurality of initial points to generate corresponding values of a first control objective and a second control objective that competes with the first control objective, automatically generating a new point at which to run a new simulation based on the plurality of initial points and the corresponding values of the control objectives, running the new simulation at the new point to generate corresponding values of the control objectives, classifying a subset of the plurality of initial points and the new point as Pareto-optimal points based on the corresponding values of the control objectives, and operating the building equipment at a Pareto-optimal point selected from the subset of the plurality of initial points and the new point classified as Pareto-optimal points.
-
公开(公告)号:US11549709B2
公开(公告)日:2023-01-10
申请号:US16457616
申请日:2019-06-28
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Payal Rajendra Pancholi , Vinay Deelip Varne , Apoorva Gupta , Abhishek Gupta , Mahesh Balkisan Mutyal , Manohar Madhukar Kulkarni
IPC: F24F11/46 , G06Q50/06 , H02J3/00 , F24F140/60
Abstract: A system for allocating resources across equipment that operate to serve one or more loads of a building. The system includes one or more memory devices storing instructions that cause one or more processors to receive operational data defining at least one of planned loads to be served by the equipment or utility rates for one or more time steps within a simulation period, determine whether the operational data define the planned loads or the utility rates for each time step within the simulation period, and in response to a determination that the operational data do not define the planned loads or the utility rates for each time step within the simulation period, identify one or more time steps for which the planned loads or the utility rates are not defined and initiate an action to define the planned loads or the utility rates for the identified time steps.
-
公开(公告)号:US11276125B2
公开(公告)日:2022-03-15
申请号:US16655745
申请日:2019-10-17
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Payal Pancholi , Abhishek Gupta , James P. Kummer
Abstract: Systems and methods for generating graphical elements in a user interface are shown according to various embodiments. Various plant designs may be simulated under scenario conditions to predict energy usage and cost. A user may indicate to perform an economic feasibility analysis for one or more simulated plant designs. Financial performance data may be generated for the one or more plant designs according to one or more analysis parameters. Financial performance data may be a Net Present Value, Internal Rate of Return, or Payback period. A graphical element may be generated in a user interface to present the generated financial performance data. Financial performance data may be compared to threshold values to determine if the plant design is acceptable. Financial performance data can be compared for different plant designs to choose the optimal plant design.
-
公开(公告)号:US11288754B2
公开(公告)日:2022-03-29
申请号:US16387356
申请日:2019-04-17
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Mohammad N. ElBsat , Michael J. Wenzel , Payal Rajendra Pancholi , Abhishek Gupta , Apoorva Gupta
Abstract: A method includes operating equipment to consume energy resources including energy or power purchased from a utility, and obtaining a block-and-index rate profile for a future time period. The block-and-index rate profile includes a block rate and a block size for each of a plurality of sub-periods in the future time period. The block size for a sub-period identifies an amount of energy or power priced at the block rate for the sub-period. The method also includes applying the block-and-index rate profile in an optimization process for the equipment over the time period, running the optimization process, and allocating energy resources to the equipment over the time period in accordance with a result of the optimization process.
-
-
-