-
公开(公告)号:US20150248319A1
公开(公告)日:2015-09-03
申请号:US14679108
申请日:2015-04-06
Applicant: Hitachi, Ltd.
Inventor: Takayuki Nagai , Masataka Nagura , Kiminori Sugauchi , Takaki Kuroda
IPC: G06F11/07
CPC classification number: H04L41/0213 , G05B23/02 , G06F11/0709 , G06F11/079 , G06N5/025
Abstract: In analyzing an elaborate computer system which requires large-scale or numerous event propagation models, a law-of-causality matrix gains size, so that significant amount of storage resources has been used in a management computer. To solve such a problem, the management computer to manage the computer system stores topologies, event propagation models, and causality information including one or more causal relations in the storage resources, determines, when the management computer analyzes or detects an event, whether a causal relation has already been created for the event to be analyzed, and creates the causal relation based on a topology and event propagation models, if not yet.
Abstract translation: 在分析需要大规模或多个事件传播模型的复杂计算机系统时,因果关系矩阵获取大小,从而在管理计算机中使用了大量的存储资源。 为了解决这样的问题,管理计算机管理计算机系统的存储拓扑,事件传播模型和包括存储资源中的一个或多个因果关系的因果关系信息在管理计算机分析或检测事件时确定是否因果 已经为要分析的事件创建了关系,并且基于拓扑和事件传播模型创建因果关系(如果尚未)。
-
公开(公告)号:US20150244599A1
公开(公告)日:2015-08-27
申请号:US14427910
申请日:2013-03-15
Applicant: HITACHI, LTD.
Inventor: Takayuki Nagai , Masataka Nagura , Kaori Nakano
CPC classification number: H04L43/0823 , G06F11/0727 , G06F11/079 , H04L67/10
Abstract: A management system manages a computer system including a plurality of types of managed objects. A storage device of the management system stores one or more meta-rules indicating a correspondence relationship between a cause event and one or more influence events, as well as change frequency information indicating a change frequency for each relation between the types of managed objects. A control device of the management system divides, on the basis of the change frequency information, a first relation group indicating a connection configuration within a rule for a first meta-rule, into a second relation group configured by a relation in which a change frequency is equal to or larger than a predetermined value, and a third relation group configured by a relation in which a change frequency is less than a predetermined value, and divides a first meta-rule into a second meta-rule in which the connection configuration indicated by the second relation group is the connection configuration within a rule, and a third meta-rule in which the connection configuration indicated by the third relation group is the connection configuration within a rule.
Abstract translation: 管理系统管理包括多种管理对象的计算机系统。 管理系统的存储装置存储指示原因事件和一个或多个影响事件之间的对应关系的一个或多个元规则,以及指示管理对象的类型之间的每个关系的改变频率的变化频率信息。 管理系统的控制装置根据变化频率信息将表示第一元规则的规则内的连接配置的第一关系组划分成由以下关系构成的第二关系组: 等于或大于预定值,以及由改变频率小于预定值的关系配置的第三关系组,并且将第一元规则划分成指示连接配置的第二元规则 通过第二关系组是规则内的连接配置,以及第三元规则,其中由第三关系组指示的连接配置是规则内的连接配置。
-
公开(公告)号:US11126945B2
公开(公告)日:2021-09-21
申请号:US16568429
申请日:2019-09-12
Applicant: Hitachi, Ltd.
Inventor: Takayuki Nagai , Hironori Emaru , Junji Kinoshita , Tatsuya Sato
Abstract: A distributed ledger node of an organization management support system includes a request unit configured to request a determination on participation to a business network from a node of another organization on a distributed ledger system when receiving a request for new participation to a business network from a node of a specific organization, and a management unit configured to collect a determination result of at least the node of the other organization, finally determine the participation on the basis of the collected result, and reply to the node of the specific organization with a result of the final determination.
-
公开(公告)号:US09619314B2
公开(公告)日:2017-04-11
申请号:US14427958
申请日:2013-04-05
Applicant: HITACHI, LTD.
Inventor: Masataka Nagura , Jun Nakajima , Takayuki Nagai , Yutaka Kudo
CPC classification number: G06F11/079 , G06F11/0709 , G06F11/0721 , G06F11/0769 , G06F11/0793 , G06F11/2094 , G06F11/30 , G06F11/3031 , G06F11/34 , G06F11/3419 , G06F11/3466 , G06F2201/81 , G06F2201/86 , H04L41/0663
Abstract: A management system manages a plurality of management target devices. A storage device stores one or more rules, plan information, and plan history information. A control device specifies a first cause event that is a candidate of a cause of the event that has occurred in any one of the management target devices based on the one or more rules, specifies a plurality of first plans that can be executed in the case in which the first cause event is a cause based on the plan information, calculates an index value indicating a possibility of succeeding in a failure recovery in the case in which the plan is executed for each of the plurality of first plans based on the plan history information, and displays data indicating any one or more plans of the plurality of first plans according to a display mode decided based on the index value.
-
公开(公告)号:US20150242416A1
公开(公告)日:2015-08-27
申请号:US14427400
申请日:2012-10-30
Applicant: HITACHI, LTD.
Inventor: Kaori Nakano , Takayuki Nagai , Masataka Nagura
CPC classification number: G06F16/122 , G06F11/0709 , G06F11/079 , G06F11/2257 , G06F11/3006 , G06F11/3034 , G06F11/3048 , G06F11/3051 , G06F11/328 , G06F16/245 , G06F16/951 , G06F2201/86
Abstract: There is provided a management computer comprising a processor and a storage resource. The processor acquires information on a type of the first management object and the second management object; traces association from the type of the second management object to the type of the first management object; generates a metarule including a condition part and a conclusion part; generates a method of acquiring information on a topology constructed by the association from the type of the second management object to the type of the first management object based on a method of the trace from the type of the second management object to the type of the first management object; acquires the information on the topology based on the generated method; generates an expanded rule from the generated metarule and the acquired information on the topology; and analyzes a detected new failure based on the generated expanded rule.
Abstract translation: 提供了包括处理器和存储资源的管理计算机。 处理器获取关于第一管理对象和第二管理对象的类型的信息; 从第二管理对象的类型跟踪到第一管理对象的类型的关联; 产生包括条件部分和结论部分的元素; 基于从第二管理对象的类型到第一管理对象的类型的跟踪方法,生成从由第二管理对象的类型到第一管理对象的类型的关联的拓扑获取信息的方法 管理对象 基于生成的方法获取拓扑信息; 从生成的元数据生成扩展规则和获取的拓扑信息; 并基于生成的扩展规则分析检测到的新故障。
-
公开(公告)号:US11373173B2
公开(公告)日:2022-06-28
申请号:US16296861
申请日:2019-03-08
Applicant: Hitachi, Ltd.
Inventor: Yosuke Himura , Tatsuya Sato , Yusuke Arai , Takayuki Nagai , Hironori Emaru
IPC: G06Q20/38 , G06F16/182
Abstract: A distributed ledger system has a configuration in which each of the distributed ledger subsystems includes a sub-ledger that holds ledger data shared in the distributed ledger subsystems, and a smart contract that interlocks between the distributed ledger subsystems having a common sub-ledger to perform a transaction processing related to an input and output of the ledger data, transmits a transaction request targeted for ledger data of another sub-ledger managed by another distributed ledger subsystem to another distributed ledger subsystem having the common sub-ledger by receiving a predetermined transaction request from a predetermined device and executing the smart contract, and replies with a transaction reply obtained from the other distributed ledger subsystem to the predetermined device.
-
公开(公告)号:US09294338B2
公开(公告)日:2016-03-22
申请号:US14679108
申请日:2015-04-06
Applicant: Hitachi, Ltd.
Inventor: Takayuki Nagai , Masataka Nagura , Kiminori Sugauchi , Takaki Kuroda
IPC: G06F15/173 , H04L12/24 , G05B23/02 , G06N5/02 , G06F11/07
CPC classification number: H04L41/0213 , G05B23/02 , G06F11/0709 , G06F11/079 , G06N5/025
Abstract: In analyzing an elaborate computer system which requires large-scale or numerous event propagation models, a law-of-causality matrix gains size, so that significant amount of storage resources has been used in a management computer. To solve such a problem, the management computer to manage the computer system stores topologies, event propagation models, and causality information including one or more causal relations in the storage resources, determines, when the management computer analyzes or detects an event, whether a causal relation has already been created for the event to be analyzed, and creates the causal relation based on a topology and event propagation models, if not yet.
-
公开(公告)号:US11573975B2
公开(公告)日:2023-02-07
申请号:US17185350
申请日:2021-02-25
Applicant: HITACHI, LTD.
Inventor: Jun Nakajima , Yoji Ozawa , Takayuki Nagai
IPC: G06F15/16 , G06F16/25 , G06F16/27 , H04L67/1095
Abstract: A data migration system 10 includes: a management server 20 configured to obtain transaction information from a distributed ledger at a data migration source, and transmit a migration transaction to a distributed ledger node at a data migration destination, the migration transaction specifying a transaction ID indicated by the transaction information obtained; and the distributed ledger node 100 configured to receive the migration transaction, obtain transaction information in the distributed ledger at the data migration source based on the transaction ID, extract data on a predetermined processing result from the transaction information obtained, execute a transaction using the extracted data as an argument, and transmit a result of the executed transaction to a transaction distribution node 300 at the data migration destination.
-
9.
公开(公告)号:US11514443B2
公开(公告)日:2022-11-29
申请号:US16632935
申请日:2018-07-09
Applicant: HITACHI, LTD.
Inventor: Tatsuya Sato , Takayuki Nagai , Jun Nemoto , Nishio Yamada
Abstract: Operation management with consistent policies and timings between nodes even in a situation where there are a plurality of administrators in the distributed ledger system is realized. In an operation management system 10 for a distributed ledger system 6 comprising a plurality of nodes, each of at least two or more predetermined nodes in the plurality of nodes manages an operation smart contract 372 for operation management of the distributed ledger system with a distributed ledger 37, when at least one node in the two or more predetermined nodes receives a transaction, the node which has received the transaction judges whether or not a type of the transaction is the operation smart contract 372, and, based on the judgment result, executes the operation smart contract 372.
-
公开(公告)号:US09628360B2
公开(公告)日:2017-04-18
申请号:US14427910
申请日:2013-03-15
Applicant: Hitachi, Ltd.
Inventor: Takayuki Nagai , Masataka Nagura , Kaori Nakano
IPC: G06F15/173 , H04L12/26 , G06F11/07 , H04L29/08
CPC classification number: H04L43/0823 , G06F11/0727 , G06F11/079 , H04L67/10
Abstract: A computer management system that manages a plurality of types of managed objects according to one or more meta-rules. In the system, the one or more meta-rules are established by dividing a plurality of relationships among the managed objects into one or more groups based on a change frequency of the relations among the managed objects.
-
-
-
-
-
-
-
-
-