Network Selection Method and Terminal Device
    1.
    发明申请
    Network Selection Method and Terminal Device 审中-公开
    网络选择方法和终端设备

    公开(公告)号:US20130235847A1

    公开(公告)日:2013-09-12

    申请号:US13866900

    申请日:2013-04-19

    CPC classification number: H04W36/0022 H04W36/26 H04W48/18 H04W88/06

    Abstract: A network selection method and a terminal device are applied to the field of communication technologies. The network selection method is applied to a terminal device based on a subscriber identity module SIM card, and includes preferentially camping a circuit switched CS domain on a first network and preferentially bearing a CS domain service by the first network; preferentially camping a packet switched PS domain on a second network and preferentially bearing a PS domain service by the second network; when communication quality of the second network fails to meet requirements of the PS domain service, camping the PS domain on the first network and bearing the PS domain service by the first network.

    Abstract translation: 网络选择方法和终端设备应用于通信技术领域。 网络选择方法基于用户身份模块SIM卡应用于终端设备,并且优先驻留在第一网络上的电路交换CS域并且优先承载第一网络的CS域服务; 优先在第二网络上驻留分组交换的PS域并且优先承载第二网络的PS域服务; 当第二网络的通信质量不能满足PS域服务的要求时,在第一个网络上驻留PS域并由第一个网络承载PS域服务。

    Neural architecture search method and image processing method and apparatus

    公开(公告)号:US12026938B2

    公开(公告)日:2024-07-02

    申请号:US17573220

    申请日:2022-01-11

    CPC classification number: G06V10/82 G06N3/082 G06N3/10 G06V10/764

    Abstract: Example neural architecture search methods and image processing methods and apparatuses in the field of computer vision in the field of artificial intelligence are provided. The example neural architecture search method includes determining search space and a plurality of construction units, superimposing the plurality of construction units to obtain a search network, adjusting, in the search space, network architectures of the construction units in the search network, to obtain optimized construction units, and establishing a target neural network based on the optimized construction units. In each construction unit, some channels of an output feature map of each node are processed by using a to-be-selected operation to obtain a processed feature map, and the processed feature map and a remaining feature map are stitched and then input to a next node.

Patent Agency Ranking