-
公开(公告)号:US20240287751A1
公开(公告)日:2024-08-29
申请号:US18505082
申请日:2023-11-08
发明人: Bangwen Zhang , Anjun Deng , Dangwei Wang , Wen Lu , Hongling Shi , Huifang Liu , Hejing Zhao , Qin Lu , Zhandi Dong , Maohua Le , Yiqin Xie , Ke Ni
IPC分类号: E02B8/02
CPC分类号: E02B8/02
摘要: A method and device for optimizing regulation of reservoir sediment discharging, comprises: determining a relation curve between a dam front water depth and a reservoir capacity; determining a time length by which a sediment peak is propagated to the front of a dam and a time length by which the sediment peak lags behind a flood peak at the front of the dam based on the relation curve and the hydrologic features; determining another relation curve between a sediment peak attenuation rate and a sediment concentration of the sediment peak, and a time length by which the sediment peak subjected to a man-made flood wave is propagated to the front of the dam; and acquiring a real-time sediment concentration, and generating the man-made flood wave based on the time length by which the sediment peak is propagated to the front of the dam and the another relation curve.