-
1.
公开(公告)号:US11711285B2
公开(公告)日:2023-07-25
申请号:US17201663
申请日:2021-03-15
Inventor: Sheng Chen , Danfeng Lu , Xin Zhao , Jingru Xie
IPC: H04L43/16 , H04L43/08 , G06F9/50 , H04L43/0876 , G06F9/455
CPC classification number: H04L43/16 , G06F9/505 , G06F9/5072 , H04L43/08 , G06F2009/45562 , G06F2009/45575 , H04L43/0876
Abstract: A method, an apparatus, an electronic device and a computer readable storage medium for adjusting an instance number are provided. The method includes: acquiring an actual performance index of a current time window; determining a theoretical instance number corresponding to the actual performance index; and in response to the theoretical instance number being greater than an instance creating upper limit of a current edge computing node, requesting another edge computing node having an instance addition capability to jointly create an instance of a total number equal to the theoretical instance number.
-
公开(公告)号:US11740997B2
公开(公告)日:2023-08-29
申请号:US17484938
申请日:2021-09-24
Inventor: Sheng Chen , Danfeng Lu , Xin Zhao
CPC classification number: G06F11/3656 , G06F11/3006 , G06F11/3051 , G06F11/3075 , G06F11/328 , G06F11/366
Abstract: Disclosed are a method and apparatus for debugging a device. A particular embodiment of the method comprises: acquiring target running state information of a target device; constructing a running configuration template and a log collection template according to the target running state information; sending the running configuration template and the log collection template to an edge computing device, and receiving target log information sent by the edge computing device, so as to determine actual running state information; when the actual running state information is different from the target running state information, computing state difference information; and finally, modifying the running configuration template by means of the state difference information value information in order to obtain an updated running configuration template, and sending the updated running configuration template to the edge computing device.
-
公开(公告)号:US11860749B2
公开(公告)日:2024-01-02
申请号:US17317393
申请日:2021-05-11
Inventor: Xin Zhao , Danfeng Lu , Jingru Xie , Sheng Chen
IPC: G06F11/26 , H04W76/10 , H04L67/125
CPC classification number: G06F11/26 , H04L67/125 , H04W76/10
Abstract: A method and apparatus for sending a debugging instruction, an electronic device and a computer readable storage medium are provided. The method may include: after acquiring a debugging instruction sent by an operating terminal, determining a debugged terminal and a first edge communication node corresponding to the debugged terminal according to the debugging instruction, and determining a debugging communication link between the first edge communication node and the debugged terminal, the first edge communication node being determined based on first edge communication node information sent by the debugged terminal, and the first edge communication node information being determined and obtained based on an edge node computing application locally installed on the debugged terminal, and sending an debugging operation included in the debugging instruction to the debugged terminal through the debugging communication link.
-
公开(公告)号:US11184227B2
公开(公告)日:2021-11-23
申请号:US16352470
申请日:2019-03-13
Inventor: Xuanchen Dong , Leding Li , Danfeng Lu , Mengtao Wang
Abstract: Some embodiments of the present disclosure relate to a method and apparatus for updating a configuration object. An implementation of the method includes: acquiring an update configuration file; determining a to-be-updated configuration object based on the update configuration file and a pre-stored historical configuration file; determining whether the to-be-updated configuration object is processing information; and updating, in response to determining that the to-be-updated configuration object is processing information, the to-be-updated configuration object based on the update configuration file when any one of the following conditions is met: the information is processed, a preset duration has elapsed since acquiring the update configuration file. In some embodiments, buffer time can be provided before updating the configuration object, and the configuration object can be updated without the user's perception.
-
5.
公开(公告)号:US11784830B2
公开(公告)日:2023-10-10
申请号:US17210190
申请日:2021-03-23
Inventor: Xin Zhao , Danfeng Lu , Sheng Chen , Jingru Xie
IPC: H04L9/32
CPC classification number: H04L9/3268 , H04L9/3265
Abstract: A method includes acquiring a root certificate of a first node; generating a target sub-certificate based on the root certificate, where the target sub-certificate includes a first sub-certificate of a first functional module of a first application associated with the first node; and sending the target sub-certificate to a terminal device. The target sub-certificate is used for the first functional module of the first application in the terminal device communicating through the target sub-certificate. In such a manner, a capability of managing the first sub-certificate of the first functional module in the terminal device can be improved.
-
6.
公开(公告)号:US20210243110A1
公开(公告)日:2021-08-05
申请号:US17201663
申请日:2021-03-15
Inventor: Sheng Chen , Danfeng Lu , Xin Zhao , Jingru Xie
IPC: H04L12/721 , H04L12/725 , H04L12/707 , H04L12/26
Abstract: A method, an apparatus, an electronic device and a computer readable storage medium for adjusting an instance number are provided. The method includes: acquiring an actual performance index of a current time window; determining a theoretical instance number corresponding to the actual performance index; and in response to the theoretical instance number being greater than an instance creating upper limit of a current edge computing node, requesting another edge computing node having an instance addition capability to jointly create an instance of a total number equal to the theoretical instance number.
-
-
-
-
-