A polymer injection method and apparatus for blocking piping in dikes and dams, uses non-water reacted two-component polymeric material to produce a hydra-insensitive expanding polymer for blocking piping channel. A transferring device is provided to the method, which includes an injection gun, an injector, and a hollow tube, wherein the injection gun connects with an entrance end of the hollow tube through the injector, and an outlet end of the hollow tube inserts into the entrance of the piping channel. The two components of the polymeric material are respectively transported to the injection gun, and are mixed and injected from the gun with high pressure, through the injector, to the hollow tube, and then pushed into the piping channel. Under the chemical reaction, the mixed material expands inside the receiver and becomes foamed solid from liquid, and then the polymer receiver inflates and blocks the piping channel quickly.
摘要:
A directional fracture grouting method with polymer for seepage control of dikes and dams includes the steps of: arranging a plurality of directional fracture grouting holes at a predetermined distance along the axis of the dike or dam; forming the directional fracture grouting holes by pushing a special drilling tool; placing a hole-sealing grouting pipe and a fracture grouting pipe into each of the directional fracture holes; and injecting including the steps of firstly injecting a small amount of polymer material into the sealing-hole pipe, and secondly injecting predetermined amount of material into the fracture grouting pipe. Under the chemical reaction, the mixed material expands, fractures the soil along the guided directions, and forms a super thin polymer segment. Finally, the polymer segments are overlapped each other, and the seepage control system is constructed inside the dike or dam.
摘要:
A polymer injection method and apparatus for blocking piping in dikes and dams, uses non-water reacted two-component polymeric material to produce a hydra-insensitive expanding polymer for blocking piping channel. A transferring device is provided to the method, which includes an injection gun, an injector, and a hollow tube, wherein the injection gun connects with an entrance end of the hollow tube through the injector, and an outlet end of the hollow tube inserts into the entrance of the piping channel. The two components of the polymeric material are respectively transported to the injection gun, and are mixed and injected from the gun with high pressure, through the injector, to the hollow tube, and then pushed into the piping channel. Under the chemical reaction, the mixed material expands inside the receiver and becomes foamed solid from liquid, and then the polymer receiver inflates and blocks the piping channel quickly.
摘要:
A process for grouting a super-thin curtain with polymer, includes: forming a series of V-shaped injecting holes by direct pushing method using a special drilling tool along a dam or dike axis spacedly at a predetermined distance; and injecting a two-component polymer composition into each of the holes, wherein the mixed polymer material expends and coagulates under chemical reaction to form a series of super-thin curtain segments, and the curtain segments connect with each other end to end to form a continuous and impermeable polymer curtain.
摘要:
A process for grouting a super-thin curtain with polymer, includes: forming a series of V-shaped injecting holes by direct pushing method using a special drilling tool along a dam or dike axis spacedly at a predetermined distance; and injecting a two-component polymer composition into each of the holes, wherein the mixed polymer material expends and coagulates under chemical reaction to form a series of super-thin curtain segments, and the curtain segments connect with each other end to end to form a continuous and impermeable polymer curtain.
摘要:
A directional fracture grouting method with polymer for seepage control of dikes and dams includes the steps of: arranging a plurality of directional fracture grouting holes at a predetermined distance along the axis of the dike or dam; forming the directional fracture grouting holes by pushing a special drilling tool; placing a hole-sealing grouting pipe and a fracture grouting pipe into each of the directional fracture holes; and injecting including the steps of firstly injecting a small amount of polymer material into the sealing-hole pipe, and secondly injecting predetermined amount of material into the fracture grouting pipe. Under the chemical reaction, the mixed material expands, fractures the soil along the guided directions, and forms a super thin polymer segment. Finally, the polymer segments are overlapped each other, and the seepage control system is constructed inside the dike or dam.