Invention Publication
- Patent Title: An Offshore Wind Turbine Installation with a Concrete-Cast Transition Piece Between the Wind Turbine Tower and its Support
-
Application No.: US18731916Application Date: 2024-06-03
-
Publication No.: US20240344501A1Publication Date: 2024-10-17
- Inventor: Henrik Stiesdal , Patrick Falk Nybroe
- Applicant: Stiesdal Offshore A/S
- Applicant Address: DK Give
- Assignee: Stiesdal Offshore A/S
- Current Assignee: Stiesdal Offshore A/S
- Current Assignee Address: DK Give
- Priority: DK 202101159 2021.12.07
- Main IPC: F03D13/20
- IPC: F03D13/20 ; E04H12/08 ; E04H12/20 ; F03D13/25

Abstract:
An offshore wind turbine installation comprising a wind turbine on a support structure. A concrete-cast transition piece is provided in between the tower of the wind turbine and a tower support of the support structure. Flanges of the tower and the tower support are either bolted to each other, sandwiching the transition piece in between, or bolted into the transition piece for fixation.