- 专利标题: Method for sensing lightning-current parameters at installations having one or more capturing devices and lightning-current diversion paths
-
申请号: US15754446申请日: 2016-08-17
-
公开(公告)号: US10852339B2公开(公告)日: 2020-12-01
- 发明人: Josef Birkl , Bernhard Eichler , Thomas Böhm , Franz Schork
- 申请人: DEHN + SÖHNE GMBH + CO. KG
- 申请人地址: DE Neumarkt/Opf.
- 专利权人: DEHN SE + CO KG
- 当前专利权人: DEHN SE + CO KG
- 当前专利权人地址: DE Neumarkt/Opf.
- 代理机构: Bodner & O'Rourke, LLP
- 代理商 Gerald T. Bodner; Christian P. Bodner
- 优先权: DE102015011739 20150904; DE102016000930 20160128
- 国际申请: PCT/EP2016/069465 WO 20160817
- 国际公布: WO2017/036793 WO 20170309
- 主分类号: G01R29/08
- IPC分类号: G01R29/08 ; G01R19/00 ; G01R15/18 ; F03D80/30 ; F03D17/00
摘要:
The invention relates to a method for sensing lightning-current parameters at installations comprising a plurality of capturing devices and lightning-current diversion paths, in particular for exposed and/or tall buildings, including wind turbines, by using a plurality of sensors on the lightning-current diversion paths to identify a lightning-current event, and comprising subsequent evaluation of the lightning-current event and the effect of the lightning-current event on the particular installation. According to the invention, a lightning-current detection sensor is formed on each of the capturing devices or each lightning-current diversion path, which lightning-current detection sensor provides a yes/no statement concerning a lightning-current event with respect to the particular capturing device or the particular lightning-current diversion path. Furthermore, at least one lightning-current measurement sensor is provided at a central point of the merging of the lightning-current diversion paths toward the ground, which at least one lightning-current measurement sensor detects both surge currents having a duration of less than 5 ms and long-term currents having a duration of more than 5 ms, wherein furthermore the magnitude of the charge of the particular long-term current that has occurred is determined and is used to determine possible effects on the installation.
公开/授权文献
信息查询