Offset mold process
    1.
    发明授权
    Offset mold process 失效
    胶印模具加工

    公开(公告)号:US07213634B1

    公开(公告)日:2007-05-08

    申请号:US11366681

    申请日:2006-03-02

    IPC分类号: B22D18/06

    CPC分类号: B22D18/04

    摘要: An offset mold process deflects a mold assembly being conveyed along a first path laterally of that path into engagement with a nozzle using a shuttle car. Molten metal is pumped into the mold assembly, which is either a cope and drag mold or a lost foam mold, from below the molded part to eliminate eddy currents which can create incongruities in the molded part. One method of flow cutoff involves movement of a first mold component relative to the bottom board cuts off the flow of molten metal and locks the mold fill in the mold assembly. A second method of flow shutoff usable in the lost foam process involves the engagement of a flow cutoff plunger to cut the flow stream once filling the mold has been completed. In both the cope and drag and lost foam apparatuses, withdrawal of the shuttle car enables molten metal in the feed line to drain into a catch ladle obviating the need to burn embedded sand from the scrap prior to its recycling into the melt.

    摘要翻译: 偏移模具工艺使沿着该路径的第一路径被输送的模具组件偏转成与使用梭车的喷嘴接合。 熔融金属从模制部件的下方被泵送到模具组件中,模具组件是上模和拖模或丢失的模具,以消除可能在模制部件中产生不协调的涡流。 流动切断的一种方法包括第一模具部件相对于底板的移动,切断熔融金属的流动并将模具填充物锁定在模具组件中。 可用于失去泡沫过程的第二种流动关闭方法涉及一旦填充模具已经完成,流动切断柱塞的接合来切割流动流。 在上下料和失物泡沫装置中,往复车的撤出使得供料管线中的熔融金属能够排入到水桶中,从而避免在废料再循环到熔体中之前从废料中烧入嵌入的砂。