-
公开(公告)号:US12000278B2
公开(公告)日:2024-06-04
申请号:US17644641
申请日:2021-12-16
发明人: Hsieh Chen , Martin E. Poitzsch , Hooisweng Ow , Ivan Cetkovic
CPC分类号: E21B49/0875 , E21B34/06 , E21B43/12 , E21B47/11
摘要: A wellbore that supplies production fluid from a first production zone and a second production zone is produced. Production fluids from the first and second production zone are comingled within a same production tubular. A first tracer is pulsed into the first production zone. A second tracer is pulsed into the second production zone. The first tracer and the second tracer are barcoded such that the first tracer and the second tracer can be differentiated from one another. A first tracer decay is measured at a topside facility. A second tracer decay is measured at the topside facility. A water cut of the first production zone and the second production zone is determined based upon the first tracer decay and the second tracer decay.
-
2.
公开(公告)号:US20230193755A1
公开(公告)日:2023-06-22
申请号:US17644641
申请日:2021-12-16
发明人: Hsieh Chen , Martin E. Poitzsch , Hooisweng Ow , Ivan Cetkovic
CPC分类号: E21B49/0875 , E21B47/11 , E21B34/06 , E21B43/12
摘要: A wellbore that supplies production fluid from a first production zone and a second production zone is produced. Production fluids from the first and second production zone are comingled within a same production tubular. A first tracer is pulsed into the first production zone. A second tracer is pulsed into the second production zone. The first tracer and the second tracer are barcoded such that the first tracer and the second tracer can be differentiated from one another. A first tracer decay is measured at a topside facility. A second tracer decay is measured at the topside facility. A water cut of the first production zone and the second production zone is determined based upon the first tracer decay and the second tracer decay.
-