-
公开(公告)号:US12024959B2
公开(公告)日:2024-07-02
申请号:US17876211
申请日:2022-07-28
发明人: Xunlez Alexis Nunez , Mengyu Zhou , Songjing Ren , Hans Sjerps
CPC分类号: E21B19/14 , B65D85/20 , B65D85/62 , B65D85/68 , E21B43/128 , F16N2031/008
摘要: A method of testing an electrical submersible pump (ESP) component may include placing an ESP component in a transport assembly at a first location for transport to a second location. The ESP component may be tested or maintained while the ESP component remains in the transport assembly, before being deployed at a wellsite. The ESP components can be prepared in the transport assembly to be lifted (including placement of lifting clamps) to run in hole. In various embodiment, the transport assembly may comprise the ESP component and a transport basket configured for stacking multiple transport assemblies.