Abstract:
An assembly procedure for an electrode anchor, and a magnetic-induction flow meter, particularly for high pressure applications with medium pressures above 5.1 MPa (51 bar), having a measuring tube on which a multi-part electrode anchor for securing a measuring electrode is arranged. Included are: a) a coupling fitting, which is materially bonded to the measuring tube wherein the coupling fitting comprises a groove, or forms a groove together with the measuring tube; and b) a coupling insert for guiding and/or securing the measuring electrode the coupling insert being connected to the coupling fitting by way of a coupling. The coupling insert comprises anchoring wings which engage in the groove by a partial rotation and thereby effect the coupling.
Abstract:
An assembly procedure for an electrode anchor, and a magnetic-induction flow meter, particularly for high pressure applications with medium pressures above 5.1 MPa (51 bar), having a measuring tube on which a multi-part electrode anchor for securing a measuring electrode is arranged. Included are: a) a coupling fitting, which is materially bonded to the measuring tube wherein the coupling fitting comprises a groove, or forms a groove together with the measuring tube; and b) a coupling insert for guiding and/or securing the measuring electrode the coupling insert being connected to the coupling fitting by way of a coupling. The coupling insert comprises anchoring wings which engage in the groove by a partial rotation and thereby effect the coupling.