-
公开(公告)号:US20240265194A1
公开(公告)日:2024-08-08
申请号:US18431650
申请日:2024-02-02
Applicant: Beijing Zitiao Network Technology Co., Ltd.
Inventor: Linxuan SHI , Zhe He , Yaodong Zheng , Bingyang Xie , Shaoqiang Huang , Maoqi Li
IPC: G06F40/137 , G06F3/04847
CPC classification number: G06F40/137 , G06F3/04847
Abstract: The embodiment of the disclosure provides a page interaction method, device, apparatus and a storage medium. When detecting that a user switches a view mode to a topological mode, a topological graph of service objects corresponding to a current service object is acquired; wherein the topological graph of service objects comprises service objects at a plurality of hierarchical levels; a topological subgraph of service objects taking the current service object as highest hierarchical level is extracted from the topological graph of service objects; instance data corresponding to one or more service objects in the topological subgraph of service objects are acquired; and the instance data are displayed on a current interface according to a hierarchical relationship of the topological subgraph of service objects.
-
公开(公告)号:US20240104503A1
公开(公告)日:2024-03-28
申请号:US18525074
申请日:2023-11-30
Applicant: Beijing Zitiao Network Technology Co., Ltd.
Inventor: Tao HONG , Dian XIONG , Chen WANG , Linxuan SHI
IPC: G06Q10/10
CPC classification number: G06Q10/103 , G06Q10/101
Abstract: Provided are a method for generating a project flow, an electronic device, and a storage medium. The method includes determining at least one process node corresponding to a target project to be configured and determining node attribute information of the at least one process node; determining a node dependence of the at least one process node; and determining, based on the node dependence and the node attribute information, execution project flow information corresponding to the target project to be configured.
-
公开(公告)号:US20240428161A1
公开(公告)日:2024-12-26
申请号:US18825725
申请日:2024-09-05
Applicant: Beijing Zitiao Network Technology Co., Ltd.
Inventor: Tao HONG , Dian XIONG , Chen WANG , Linxuan SHI
IPC: G06Q10/0633
Abstract: A method includes acquiring a to-be-used execution project flow, where the to-be-used execution project flow includes multiple to-be-used flow nodes; in response to detecting that an operation on at least one to-be-used flow node is a preset operation, updating the to-be-used execution project flow, and in response to detecting that a target control is triggered, using the updated to-be-used execution project flow as a target execution project flow.
-
公开(公告)号:US20240314041A1
公开(公告)日:2024-09-19
申请号:US18674314
申请日:2024-05-24
Applicant: Beijing Zitiao Network Technology Co., Ltd.
Inventor: Tao HONG , Dian XIONG , Chen WANG , Linxuan SHI
IPC: H04L41/12 , G06F3/04842
CPC classification number: H04L41/12 , G06F3/04842
Abstract: Embodiments of the present disclosure provide a node state determination method and apparatus, an electronic device, and a storage medium. The method includes: determining node attribute information of a linkage process node in response to determining a current process node as the linkage process node; determining at least one third-party platform based on the node attribute information, and sending task information corresponding to the linkage process node to the at least one third-party platform, such that the at least one third-party platform processes the task information; and receiving feedback information from the at least one third-party platform, and updating a node state of the current process node to a target state based on the feedback information.
-
公开(公告)号:US20240095633A1
公开(公告)日:2024-03-21
申请号:US18525120
申请日:2023-11-30
Applicant: Beijing Zitiao Network Technology Co., Ltd.
Inventor: Tao HONG , Dian XIONG , Chen WANG , Linxuan SHI
IPC: G06Q10/0633
CPC classification number: G06Q10/0633
Abstract: A method includes acquiring a to-be-used execution project flow, where the to-be-used execution project flow includes multiple to-be-used flow nodes; in response to detecting that an operation on at least one to-be-used flow node is a preset operation, updating the to-be-used execution project flow; and in response to detecting that a target control is triggered, using the updated to-be-used execution project flow as a target execution project flow.
-
-
-
-