发明授权
US08560284B2 System and method for alternative simulation of logistics infrastructure 有权
物流基础设施替代模拟系统和方法

System and method for alternative simulation of logistics infrastructure
摘要:
A future amount is created through demand estimation by rectifying data administrated in a logistics infrastructure through a system and a method for alternative simulation of a logistics infrastructure. In addition, an infrastructure load by a future year amount is analyzed and an alternative is selected through the load analysis.
信息查询
0/0