- 专利标题: Geothermal development system and the construction method thereof
-
申请号: US17040897申请日: 2019-01-12
-
公开(公告)号: US12000626B2公开(公告)日: 2024-06-04
- 发明人: Chunan Tang , Jian Zhao , Juying Yang , Tianhui Ma , Sijing Wang , Mu Tang
- 申请人: MECHSOFTTECHNOLOGY (U.S.A.) CO., LLC , DALIAN UNIVERSITY OF TECHNOLOGY , DALIAN MECHSOFT CO., LTD
- 申请人地址: US WA Kenmore
- 专利权人: MECHSOFT TECHNOLOGY (U.S.A.) CO., LLC,DALIAN UNIVERSITY OF TECHNOLOGY,DALIAN MECHSOFT CO., LTD
- 当前专利权人: MECHSOFT TECHNOLOGY (U.S.A.) CO., LLC,DALIAN UNIVERSITY OF TECHNOLOGY,DALIAN MECHSOFT CO., LTD
- 当前专利权人地址: US WA Kenmore; CN Liaoning; CN Liaoning
- 代理机构: MUNCY, GEISSLER, OLDS & LOWE, P.C.
- 国际申请: PCT/CN2019/071502 2019.01.12
- 国际公布: WO2020/143066A 2020.07.16
- 进入国家日期: 2020-09-23
- 主分类号: F24T10/30
- IPC分类号: F24T10/30 ; E21B7/04 ; F24T10/15 ; F24T10/20
摘要:
A geothermal development system includes a ground lifting system, a large-diameter shaft, an underground high temperature and high pressure heat transfer pool, a heat transfer diversion channel, a hot mine blasting fracture reservoir formed by an inlet blasting tunnel and a main tunnel, and a removable sealing device. The injection pipe and the collection pipe are set along the large diameter silo wall in the geothermal development system. The injection pipe is connected to the collection pipe through the heat transfer diversion channel in the dry hot rock. The circulation main roadway is arranged around the underground high temperature and high pressure heat transfer pool. Multiple blasting roadways are set along the main roadway level to form hot mine blasting fracture reservoir with loose blasting by caving method. A movable sealing device is arranged above the blasting layer of the large-diameter shaft.
公开/授权文献
信息查询