Invention Grant
- Patent Title: Kind of no-pillar and gob-side entry retaining mining and construction method without the mining area division
-
Application No.: US17054677Application Date: 2020-03-24
-
Publication No.: US11746654B2Publication Date: 2023-09-05
- Inventor: Qihua Ma , Zhongcheng Qin , Kegong Fan , Jianguo Ning , Zhongping Guo , Zhijie Wen
- Applicant: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY
- Applicant Address: CN Qingdao
- Assignee: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY
- Current Assignee: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY
- Current Assignee Address: CN Qingdao
- Agency: CBM Patent Consulting, LLC
- Priority: CN 2010070706.0 2020.01.21
- International Application: PCT/CN2020/080949 2020.03.24
- International Announcement: WO2021/031561A 2021.02.25
- Date entered country: 2020-11-11
- Main IPC: E21C41/18
- IPC: E21C41/18 ; E21F1/00 ; E21F13/06

Abstract:
A method is to excavate main roadways in the upper and lower parts separately and an inclined intake roadway in the central part of the mine and pre-excavate an inclined seam roadway as the first mining face at the boundary on one side of the mine. Staring from the mine boundary, the retreating mining shall be carried out on the first mining face strip by strip with belt conveyors arranged in the upper main roadway and assistant conveying devices in the lower main roadway and inclined intake roadway; the open-off cut of the first mining face shall be built on the underside of the upper main roadway at the boundary of the mine to carry out the downward inclined mining on the strike and along the inclination.
Information query