Method and structure for risk-based resource planning for configurable products
Abstract:
A method for planning under uncertainty is disclosed. The method includes steps of processing a stochastic programming formulation based on forecast values of at least one of product and service configurations, and determining a resource requirements plan for one or more planning periods in a non-deterministic bill of resources of at least two levels.
Information query
Patent Agency Ranking
0/0