Material control to prevent well plugging
摘要:
A method and systems for sand control in wells are described in examples. An example uses a prepack screen assembly comprising an inner screen comprising openings having an inner size and an outer screen comprising openings having an outer size. Packing material is disposed between the inner screen and the outer screen comprising pores with a pore size that is selected based, at least in part, on the outer size, the inner size, or both.
公开/授权文献
信息查询
0/0