发明授权
- 专利标题: Combined power generation plant and combined power generation plant control method
-
申请号: US17257926申请日: 2019-07-12
-
公开(公告)号: US11415078B2公开(公告)日: 2022-08-16
- 发明人: Tomoya Hayashi , Jun Taguchi , Satoru Matsuo , Kei Moriyama , Ken Tamura , Kentaro Nakamura , Yuji Ohta
- 申请人: MITSUBISHI POWER, LTD.
- 申请人地址: JP Yokohama
- 专利权人: MITSUBISHI POWER, LTD.
- 当前专利权人: MITSUBISHI POWER, LTD.
- 当前专利权人地址: JP Yokohama
- 代理机构: WHDA, LLP
- 优先权: JPJP2018-133155 20180713
- 国际申请: PCT/JP2019/027666 WO 20190712
- 国际公布: WO2020/013309 WO 20200116
- 主分类号: F02G5/02
- IPC分类号: F02G5/02 ; F01D1/00 ; F01D13/00 ; F02B33/00
摘要:
In the present invention, a coal gasification combined power generation facility comprises: a feed water supply line (72); a condensate pump (39) and an intermediate-pressure feed water pump (40); a turbine bypass line (32) that bypasses a steam turbine and supplies steam to the condenser (73); and a spray water line (76) that supplies the feed water to the turbine bypass line (32). The coal gasification combined power generation facility has a normal operation mode and a bypass operation mode, and in the bypass operation mode, a control device (80) supplies the feed water to the turbine bypass line (32) and performs a first opening degree control to control the opening degree of the supply adjustment valve so that the amount of feed water supplied to the exhaust heat recovery boiler becomes less than that in the normal operation mode.
公开/授权文献
信息查询