Intelligent workload migration to optimize power supply efficiencies in computer data centers
Abstract:
The disclosed embodiments provide a system that intelligently migrates workload between servers in a data center to improve efficiency in associated power supplies. During operation, the system receives time-series signals associated with the servers during operation of the data center, wherein the servers include low-priority servers and high-priority servers. Next, the system analyzes the time-series signals to predict a load utilization for the servers. The system then migrates workload between the servers in the data center based on the predicted load utilization so that: the high-priority servers have sufficient workload to ensure that associated power supplies for the high-priority servers operate in a peak-efficiency range; and the low-priority servers operate with less workload or no workload.
Information query
Patent Agency Ranking
0/0